Skip to the record
For the highest quality transcripts.

Council archive · source document

Body Corporate - Deed of Engagement 13.04.2022 · 132006.823.10

of 38

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                          Page 20
NICHOLSONS     Deed of Engagement
  Solicitors


[OCR of page images]
NICHOLSONS

 

D Page 20
Si
olicitors Deed of Engagement
__NICHOLSONS__ ac
SOLICTIORS cones ene

 

 

15. To carry out minor repairs and maintenance to the Common Property (limited to those repairs
and maintenance not requiring the services of a skilled or licensed tradesman).

146. To ensure at all times that work cartied out pursuant to external maintenance OF service
agreements or by other tradesmen is carried out at the scheduled times and in a good and
workmanlike manner. hg

47. To comply with and carry out all reasonable directions from time to time given by the Body

Corporate to the Caretaker in and about the control management administration of the
Buildings and the performance of the Body Corporate of its lawful obligations and duties.

48. As and when directed by the Body Corporate to attend meetings of the Body Corporate and its
Committee.

19. At all times ascertain and be aware of the general condition of the Buildings and all machinery
and appurtenances thereto and upon request inform the representative of the Body
in respect thereof.

20.To perform such other acts and things as are reasonably necessary and proper in the
discharge of its duties under this agreement.

21. To provide (at the Caretaker’s cost) all equipment necessary to perform the duties set out
herein including a suitable vehicle (and trailer if necessary) to collect and transport garbage
bins for each Lot to and from the refuse collection area on Common Property, garden tools,
hoses and fittings but not including cleaning equipment, fuels, oils, fertilizers and other
expendables which are at the cost of the Body Corporate.

22. To supervise (only) the mowing and edging of grassed common areas (the work to be done by
a contractor engaged by the Body Corporate at its cost).

23.To be on site at all reasonable times as necessary to fulfill the duties detailed in this
Agreement and when not on site to be contactable by phone between the hours of 9am to Spm
Monday to Friday and 9am to 42 noon on Saturdays (excluding public holidays).

24, The specific duties detailed in Schedule Two.

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Body Corporate - Deed of Engagement 13.04.2022.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.