Reference Document - MCU24/0002 [As Published]
Original PDF page 8, section 1. The text section number identifies this passage in the reader.
Job No: 23-458
Page 8
• No tension cracks were observed within the site;
• Hummocky or bulging soils were not identified on the site slopes. There were sections of uneven
ground downslope of the house, which is attributed to previous earthworks and the removal of
trees.
• Physical observations made on existing structures such as Trees and Crib retaining walls
indicate signs of soil creep;
Evaluation of these features in a Landslide Frequency Assessment Form provided an indication of their
relative importance to slope failure. The assessment of the features included the allocation of a weighted
factor for each feature based on site observations, judgment, and experience. This allows a Relative
Frequency to be calculated by multiplying the selected factors together for each of the above site
conditions highlighted in blue and green.
From the assessment of results from their study (Hargreaves and Kidd 2012) and other studies in similar
terrain, a correlation between Relative Frequency and Hazard Rating has been established, as shown
in Table 2.
Table 2: Correlation between Relative Frequency and Hazard Rating
Relative Frequency (Output) Hazard Rating (Susceptibility)
< 0.2 Very Low (VL)
0.2 – 0.6 Low (L)
> 0.6 – 2.0 Moderate (M)
> 2.0 – 6.0 High (H)
> 6.0 Very High (VH)
The above major site features listed in Section 2.4 have been considered in determining a likelihood
estimate of landslides in this property. The features relevant to this site under consideration, as
recommended by Hargreaves and Kidd (2012), apply to Case 1 (1 - 7) and Case 4 (1 – 22).
With knowledge of the proposed development (earthworks, retention systems, fill, etc.), the assessment
has been carried out for the pre and post-development stages. The assessment indicates that the
relative frequency (Output) pre-development is 1.09 for Case 1 (items 1 to 7), which implies that the
landslide risk on the site is "Moderate", which may be tolerated by regulators; however, requires
investigation and implementation of treatment options to reduce the risk to Low or better.
To reduce the potential landslide risk level from “Moderate” to "Low" or better, the recommendations
presented in Section 2.5 should be implemented during and after construction.
2.5 Landslide Risk Mitigation Strategy
#399 Sunrise Road, Tinbeerwah, was identified as a "Moderate” landslide risk site per current site
conditions. The following recommendations are therefore provided to improve the landslide risk level
onsite during and post earthworks.
2.5.1 Fill
The borehole logs have not disclosed any fill at the drilled locations onsite. However, given the landform,
it is expected that some areas of fill would be present. Any material identified as fill is deemed unsuitable
to support structural loads. In areas subject to structural loads, these materials must be removed and
replaced with fill that is engineered and certified.
2.5.2 Cut and Fill Batter Support
Cut/fill batters must be cut to a grade no greater than 14 degrees (1V:4H). Batters steeper than this
must be appropriately retained. An engineered post and concrete sleeper or block retaining wall is
deemed appropriate for the site conditions.
Ref: 4602
399 Sunrise Road, Tinbeerwah
Document Set ID: 22750694
Version: 1, Version Date: 03/01/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.