Geotech Report - Initial Findings
Attached to the e-mail Operation Works Application - OPW19/0266 - 215 David Low Way, Peregian Beach - (EMAIL 2/3) - Site Based Stormwater Management Plan, Acid Sulphate Soil & Groundwater Management Plan.
Essence of Peregian
215-219 David Low Way, Peregian Beach
Project No. 007-160A,
27 April 2010
It will be essential to ensure that all services connecting into the site that are to be terminated are properly
sealed off (including trench backfill) to prevent them becoming water conduits to the site and causing water
pressure surcharging of excavation support works.
5.5 Site Settlement
Provided the subgrade is prepared in accordance with Section 5.3 and no soft/firm clays exist, it is
preliminarily estimated that subgrade settlement induced by fill placement could be in the range 10mm to
30mm per metre depth of fill placed, under the weight of the fill alone (i.e. no structure loads applied to the
fill). Some (additional) settlement will also occur within the fill due to self-weight and these settlements could
be of the order of 1mm to 3mm per metre of properly compacted fill placed.
5.6 Foundations
The site is underlain to approximately 0.8m by fill and/or to approximately 1.2m to 3.9m depth by ‘low
bearing capacity’ and potentially highly variable, very loose to loose sands, with a reasonably high
groundwater level. It is therefore considered strip and pad foundations should be extended to found in the
medium dense sands or the indurated sands. If this is not possible, then buildings could be supported on a
(preferably non-vibratory) pile system, founding in the medium dense to dense sand and dense, weakly
cemented indurated sand. Bored piles would be expected to encounter severe construction difficulties and
their use is not recommended.
It should be noted that a strength inversions were encountered in the bores and that detailed consideration
must be given to the presence of the inversion in the selection of foundation bearing pressure and founding
depth.
5.6.1 Strip and Pad Footing
Working bearing capacities that could be used for preliminary design of strip and pad footings are presented
in Table 5. Footing design will also need to consider footing settlement, which would need to be assessed in
detail once footing sizes, loadings, layouts and locations are known.
Table 5: Working Bearing Capacity for Design of Shallow Foundations in Natural Soils
(1)
Working Bearing Capacity
Material Strength
(kPa)
Controlled Fill Level 1 100
(2)
medium dense 250
Sand (2)
dense/weakly cemented 400
(1) Not underlain by ‘softer’ material
(2) Given as a guide only and should be assessed before finalising design - dependent upon footing width and
founding depth
It is considered that variations in fill, soil strength are likely to occur over the site at founding level and that a
‘flexible’ approach would best be adopted to foundation design and construction methodology, so that footing
sizes/founding depths can be readily adjusted as required during construction, without cost/time penalties
being incurred. It should also be noted that ‘strength inversions’ were encountered in the bores (i.e. lower
strength material underlying higher strength material), for example in Bore 11 a layer of loose sand was
encountered at 6.2m depth underlying medium dense sand.
butlerpartners.com.au Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.