BORE REPORT
Client: Scanlon Properties Pty Ltd BORE 3
Project: Residential Development Page No: 1 of 1
Location: 215-219 David Low Way, Peregian Beach Date: 8 June 2007
Project No: 07160 Ground Surface Level: RL 7.5m*
Sample Depth (m)
Sample Type
Test Results
Description
Depth (m)
Lithology
RL (m)
7.5
0 0.0
FILL
- grey-brown, sandy fine sub-angular gravel D
SAND (SP) 0.25
- light grey-brown, fine grained
D
7.0 0.5
D
0.75
D
1 1.0
D
1.25
D
6.0 1.5
- medium to coarse grained
D
1.75
D
2 2.0
D
2.25
D
5.0 2.5
End of Bore at 2.5 m
3
Is(50) Point Load Test Result (MPa) Up Pushtube Sample S Standard Penetrometer Test (SPT) D Disturbed Sample
E Environmental Sample C NMLC Coring (d) Diametral Point Load Strength Test B Bulk Sample
U Undisturbed Tube (50mm diameter) HB SPT Hammer Bouncing (a) Axial Point Load Strength Test
pp Pocket Penetrometer Test (kPa) ( ) No Sample Recovery V Vane Shear Strength, Uncorrected (kPa)
Rig: Hydrapower Trekker
Drilling Method: Auger
Groundwater: Free groundwater encountered at 1.5m depth
Remarks: * Approximate ground surface level interpolated from PMM Group's Drawing No. 7328-03, dated 18 April 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.