Council archive · source document
07/2024 - Approved plans [As Published] · 142007.2024
Plans and drawings: the text below has words only, no drawings.
ANGINGOTIARG ONY! ONY1 HISVNV
Wh Leos! “yp ip awa
ToT
SIMS “OnnvacA |
___ SOWWAGHOS CNV
UBL NOLS “ZO¥NIVEC
‘NIG AVLNYS
QOL SUN?YN
SC O88 799 Si NV EID CONS ONT FNC
SUO}JBAOCUL
uBlsep jeoms
(BE ESB OO NOY OL AL SENCTION JONNY
+1¥S90 ON YSTO
S0V3H VSOON
L3ULS INVYD St
yaa 40 HSIuVd
HOUVW 40 ALNNOD
6L86L1dS NO Zt 107
aw ores
[@orTs|
[aotrst
z pag
Cy
1
JO}!SIA
| ju
SOIVAGHOs JOvNIVEC CAIVAS TT
Wi
vain —:
AROOOR! 2D ANP ¥ 34H OL ULI
Yee NOS SSO
oA
au
Fro
aus
QSAOHddY SNVIE
LNFINEOIZARG ONY 1 HSOYNVM) 8U} 10 WACUadY
o1pay
vane
dBi el a
|pund’
sure He oo DIOR
Dh pron
pon 1
IV 3
coca? I s
ai
| pag
L_.
L 2
'Paw
SE
@
ZY Pon
e
a”
a)
2g
oe
TiagulS INVUS
%
ed %
re m
wpz6'61 .02,55241
wpZ6'6L
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 2 pages
Page 2
SEDIMENT AND EROSION PLAN
522" §8°20" 49.04 < . STEEL / TIMBER POST long, TO BE SPACED
BOWop ‘= 4. ~ < LEGEND AT 3.0m MAXIMUM crs. EXACT SPACING OF POSTS TO Odjective/target Comply with alt statutory regulations and “]
7 % 2 BE CONFIRMED ON SITE BY SUPERINTENDENT. POSTS : maintain them during construction and the
yx 4, ~ — = Z| TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC maintenance period. Comply with this erosion
i? |Y z| and sediment control plan, to control
E a Y EXTENT OF EARTHWORKS. 2 “SILT LOK’ FILTER FABRIC for approved equiv.) erosion and sediment flows.
YY: ~ 3 COMPACTED BACKFILL TO TRENCH Management Strategy Site foreman to identify and check direction
INDICATES FIELD INLET * 13.09 EXISTING SPOT LEVELS of storm water land flows as shown on the
SEDIMENT TRAP REFER DETAIL.
plan. Provide barriers and other measures
shown on the plan to prevent storm water
flows over embankments and sediments into
catchpits.
SILT FENCE {SEE DETAIL)
LAY THE TOE-IN FLAP OF FABRIC IN THE
BOTTOM OF TRENCH AS SHOWN
BUILDING OUTLINE
FIELD INLET SEOIMENT TRAP Tasks/Actions Erect sediment barriers at the top of
embankments as shown on the drawing.
Strategically place check dams around gully
pits.
TYPICAL SILT FENCE
DETAILS nts
Performance Indicators Site foreman to check erosion and sediment
flows at the base of embankments after
+ OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH rain. , ;
+ DRIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO Check that check dams are working during
PREVENT SEPARATION OF FENCE. rain periods.
Frequency/Deadiine Site foreman to monitor performance after
every heavy downfall.
tvacenes k BELT LOOP TO BE TWISTED Responsible Person/ Site foreman to be responsible for
.. DATE.. Jeewrokce AROUND TOP OF POST Organisation inspections
e “yf: DATE 2? /Te0H F Reporting/Review Site workers to advise foreman if they
. .DATEZLZ7).L0...) 2Q2Z. notice any barrier needing repair.
SDD FOR APPROVAL FENCE TO POST Correcie Actions | Cipevicer exo barrier or check doms es
ete bene rece ee eneeeceeceenee CONNECTION NTS required.
IRCUMSTANCES MAY THE
se BE DEPARTED FROM WIT!
‘AL of the MANAGER LAND DE
PLANS APPROVED
DARE PLA OO”
iE SILT FENCE FIXED IN
s : WITH MANUFACTURERS SPEC. TO
TEMPORARY SITE FENCING.
52° 55720" 33.711
CONTROL OF THE WIND CARRIAGE OF DUST
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED:
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF
THREE (3) TIMES PER DAY AT MAXIMUM THREE (3} HOUR INTERVALS, UNTIL
SATISFACTORY GROUND COVER IS ACHIEVED.
10
POST B END POCKET
SUGGESTED STOCKPILE LOCATION. ACTUAL
B LOCATION TO BE DETERMINED ONSITE BY
‘SUPERINTENDENT JOINING SECTIONS FOR
SILT FENCE nis
SEDIMENT MANAGEMENT DETAILS
e 2 TEMPORARY CONSTRUCTION ENTRY/EXIT. REFER TO ENT_MAN ENT _DETA
By Wats eter DETAIL. ALL CONSTRUCTION VEHICLES TO USE THIS 1 PROVIDE SILT F AT THE TOE OF ALL fll
‘ge ENTRY. THE CONTRACTOR SHALL CONTINUOUSLY aR ERS ENCES AT tL FIL
“tgnipoe MONITOR [THE ROAD ADJACENT TO THE SITE FOR ,
2 PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND
og SITE AND IMMEDIATELY REMOVE SUCH MATERIAL. WHERE DIRECTED.
ANY ang OR OTHER MATERIAL CARRIED OFF THE
3. PROVIDE TEMPORARY SILT TRAPS AS DIRECTED.
CONCRETE MASONRY BLOCKS INLET WITH GRATE
(50 SERIES} ‘4. THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE
MAINTAINED UNTIL ACCEPTANCE ‘OFF MAINTENANCE’.
SEDIMENT AND EROSION CONTROL LAYOUT PLAN
eos 2 3 8 5S on
et et et
SCALE 1.100 @ Al
5. THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED
ERM (300mm IN ACCORDANCE WITH ‘SOIL EROSION AND SEDIMENT
MIN HEIGHT) CONTROL’ BY THE IEA AND MAY BE VARIED 6Y THE
GEOTEXTILE FABRIC,
BIDUM U34 OR SIMILAR.
— COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS.
mea WIRE NETTING earn Te BAS BLOCKS
to ALL SIDES OVERFLOW « TURFING AND SEEDING ARE TO BE CARRIEO QUT AS
NOTE: ALL SERVICES RUNOFF WATER SGON AS PRACTICABLE. REFER TO THE SPECIFICATION
f CATED RUNOFF FROM PAD WITH SEDIMENT FOR SEED MIXES AND APPLICATION METHODS.
SITE DESCRIPTION TO BE LOCA DIRECTED TO SEDIMENT TRAP. SEDER FILTERED WATER
LOT 12 on SP179879 ON SITE BY CONTRACTOR
PARISH OF WEYBA PRIOR TO ANY CONSTRUCTION FIELD INLET WITH GRATE
TEMPORARY CONSTRUCTION
ENTRY/EXIT_ SEDIMENT TRAP n.1-s FIELD INLET SEDIMENT TRAP n.t.s
COUNTY OF MARCH
NOTES:
vate OCTOBER 2007
PROJECT:
TITLE: Z
1 Tis & the papsy ot he engee, end aye SX, BARLOW GREGG Swarava_| SEDIMENT AND EROSION PROPOSED DUPLEX nro
ep repeat mas Bee eS scx sussr as CONTROL LAYOUT PLAN, 15 GRANT STREET [een exe |
leftingeneat i acy wey may tescft in lege! action. G FURIE COAST: fuse coast. = NOTES AND DETAILS NOOSA HEADS . .
2, Figured imerios take pececeme ever scled Faodaber 450 CORAL COAST: ASS0GRTEO COWSOTANTS PROJECT-SUBSET-SHEET-REVISION
1 Ney ins 0 mocon bm meeimesres | BURLEIGH DESIGN
BM070201 - C01
Fox ‘etTsus qi
Amendment fox (OT Soe 5s AY COAST:
Amendment Prone 10) (86 1677
Ph: {67} S591 2155 Fox: {07} 5391 2188
Page 3
’ ’ . ;
: : : '; 8
5000 Litre ms = ee
, meee 5000 Litre
Underground Water tank \ —-——
\ 322°55'20" 49.924m ae Underground Water tank
"e 8 "s__ PVC Stomwater Pipes Ts s|§ &
g “ s to Hydraulics Eng. Details = | ec _o
‘ 3 Easement, see SP179879
at no
nmwaterPpe \ : __ _ _ Easement, see SP179879
tes Eng. Details PF /7e
mo Lo a 4s ©
oo fa 7 af
an? \ a Codes of Reference
E ) 4 {| _| . A wo Building Code of Australia
= i ~~ —™ --" i 18 AS 1684.2 Part 2 Non-cyclonic areas
~ 1’ —! ~~ ~ ' \ .
BS) . 4 >- oN 4 :
o | ' 8 Hem & I 2 + gs
3 ! RODE a e.-- fe 4 Property Description
“4 Lo. ---4 0" ~ | Te PVC Stormwater Pipe
Bp RL 13.913) jj —~ to Hycroules Eng, Details ce No 59879
N plo - = ' ~ a oO.
iB 33322 4 Unit 147 _ Unit 2 3332 ya Area oflot 672m?
| (Mal i ~- Jom ee Wall “Parish of WEYBA
‘. : ‘yd County of MARCH
JC Stormwater Pips Site coverage 267.85m? ( 39.86% )
Hydraulics Eng. Details
ee
: ~ 4
oS
Qa
wo
Ww
N
wo 8
a
she
Hes
fs
—_ _ fe
A
Bin enclosure 7
Flood Notes
Given FFL's do not nominate flood level.
RL of habitable rooms to be determined
by using flood level records from council
or relevant certifying authority.
Nominated FFL relates to minimum proximity
of FFL to finished ground level.
Flood level to be obtained from certifying
authority unless otherwise stated.
7590
1060
1910 1910
1060
(RL 13.913
-
75x75 SHS to Eng, Details
Unit 2 ining
Sink E galeyg
‘ete |
Ne =|
ower aaa,
=
180
190
ctpath Uy |lCOté‘d)”StS*é«é‘AA2°5B'2O RL 18,746
1.5m wide Footpath Sos Ns
to Council specifications “ “2 Ss 4.5m wide Footpath
to Council specifications
2. _ t.5mwide Footpath
2 ge to Council specifications
yr, 8
4,
edge of bitumen
% , 2, 4000 + “ee,
{GRANT STREET.
. ane marking
. 5
2 2
direction of trafic:
bitumen formation
TBM
y
R
o
J
x
Nail in Kerb
ate |
SIE PLAIN
Energy Efficiency
| INTERNAL LIGHTING
40% of total internal floor area of the building,
including an associated garage, shall be
illuminated with fluorescent or compact
fluorescent lighting.
PLUMBING FIXTURES:
-All shower roses to be 3 star rated or AAA.
-Pressure limiting devices to be fitted where
main water available. Pressure not to exceed 500 kPa.
-Toilets to be due! flush with max 6 litre full flush
and 3 litres on half flush.
Hot water system to be one of the following;
(A) Five star gas hot water system.
(B) Either a heat pump or solar hot water system where:-
(i) in a building with 3 or more bedrooms, the hot
water system must be eligible to receive at least
22 renewable energy certificates; or
(ii) in a building with 1 or 2 bedrooms the hot water
system must be eligible to receive at least 14
renewable energy certificates
GROUND FLOOR PLAN
Termite Protection Ground Fir Area's
The supply of stainless steel mesh by Termi-Mesh UNIT 1
to be installed to manufacturers specifications by an 01 Ground Floor Area
accredited technician, in accordance with the current 02 Ground Floor Deck
AS 3660 and B.C.A. 3.1.3.1. Maintain 75mm clearance
to external paving below ail weep holes.
. : UNIT 2
Final perimeter spray recommended 01 Ground Floor Area
- - 02 Ground Floor Deck
Stairs Caiculations
STAR | RISERS | GOINGS =| LANDINGS/| 2R+6
WINDERS
350x360 Engaged
brick pier with N12 - ~
fod grouted in
m?
52.41
15.58
68.00
52.41
15.58
68.00
136.00
® a 5_ 1938 5 Timber Floor Joists
— @ 450 cls to Eng. Details
240
tt ~- Steel RHS to Eng. Details
id
2
ws
s
&
oo
Px]
Si
2
DECK
[PILAIN
CKO BY... a DATE,
AMEND CKD BY. DATE. 2?)
RECOMMENDED FOR APPROVAL
UNDER NO CiRCUMSTANG
per pe na ES {=
RRRTIEICATIONS BE DEPARTED FROM wh
ITVEN APPROVAL of the MANAGER LAND DE
PLANS APPROVED
DATS D, D1 2007 fettsee thet Le
Note:
All Bracing, Tiedown, Concrete footings,
Concrete Slabs, Structural Timber &
Structural Steel to Engineers Specifications
and Details
DATE:
day. Month {REVISION
42 | SEPT.07 [PRELIMINARY PLANS.
| 20 | SEPT.O7 [PRELIMINARY PLANS] 2
| 26 | SEPT.07 [Co-ordinated with Hydraulics Plans [3
18 | OCT .07 [Co-ordinated with Stuctural Eng. Plan
14 | NOV.07 [Council requested information
jf
| |
NOT FOR CONSTRUCTION
1:100, 1:1 12-09-07
DESIGN DRAWN
PLB JHS
All work shall comply with relevent Australian
Standards and Local Government By Laws.
a ABASER LAHD I. Exes,
P
m
4
m
CHECKED
All dimensions to be checked on site Prior to
commencement of work.
Do not Scale from drawings. Use figured
dimensions only.
part without tie written permission of ~~ ~~
BURLEIGH DESIGN
cracnwnoveooy |i
TERRAIN CATEGORY | | i
LOCAL AUTHORITY building designers
Noosa Shire Council coon ot
queensiand Inc.
QB.S.A. No. 065414
LINOLIGHT HOLDINGS PTY. LTD. ACN O10 852 212
burleigh design
P.O. Box 217, CHIRN PARK, QLD 4215
Phone: (07) 5591 2155
Fax : (07) 5591 2188
PSITEPLAN TITLE
CLIENT
MR &. MRS TODD
PROJECT
PROPOSED DUPLEX
LOT 11 GRANT STREET
NOOSA HEADS
Sheet 10F8
07-3646
Used in these records
07/2024 - Approved plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 633 KB (small file)
- File type
No other editions are linked here.