SEDIMENT AND EROSION PLAN
522" §8°20" 49.04 < . STEEL / TIMBER POST long, TO BE SPACED
BOWop ‘= 4. ~ < LEGEND AT 3.0m MAXIMUM crs. EXACT SPACING OF POSTS TO Odjective/target Comply with alt statutory regulations and “]
7 % 2 BE CONFIRMED ON SITE BY SUPERINTENDENT. POSTS : maintain them during construction and the
yx 4, ~ — = Z| TO BE POSITIONED ON DOWNSTREAM SIDE OF FABRIC maintenance period. Comply with this erosion
i? |Y z| and sediment control plan, to control
E a Y EXTENT OF EARTHWORKS. 2 “SILT LOK’ FILTER FABRIC for approved equiv.) erosion and sediment flows.
YY: ~ 3 COMPACTED BACKFILL TO TRENCH Management Strategy Site foreman to identify and check direction
INDICATES FIELD INLET * 13.09 EXISTING SPOT LEVELS of storm water land flows as shown on the
SEDIMENT TRAP REFER DETAIL.
plan. Provide barriers and other measures
shown on the plan to prevent storm water
flows over embankments and sediments into
catchpits.
SILT FENCE {SEE DETAIL)
LAY THE TOE-IN FLAP OF FABRIC IN THE
BOTTOM OF TRENCH AS SHOWN
BUILDING OUTLINE
FIELD INLET SEOIMENT TRAP Tasks/Actions Erect sediment barriers at the top of
embankments as shown on the drawing.
Strategically place check dams around gully
pits.
TYPICAL SILT FENCE
DETAILS nts
Performance Indicators Site foreman to check erosion and sediment
flows at the base of embankments after
+ OVERLAP POSTS AS SHOWN TO PREVENT FLOW THROUGH rain. , ;
+ DRIVE POSTS FIRMLY TOGETHER AND WIRE TIE AT TOP TO Check that check dams are working during
PREVENT SEPARATION OF FENCE. rain periods.
Frequency/Deadiine Site foreman to monitor performance after
every heavy downfall.
tvacenes k BELT LOOP TO BE TWISTED Responsible Person/ Site foreman to be responsible for
.. DATE.. Jeewrokce AROUND TOP OF POST Organisation inspections
e “yf: DATE 2? /Te0H F Reporting/Review Site workers to advise foreman if they
. .DATEZLZ7).L0...) 2Q2Z. notice any barrier needing repair.
SDD FOR APPROVAL FENCE TO POST Correcie Actions | Cipevicer exo barrier or check doms es
ete bene rece ee eneeeceeceenee CONNECTION NTS required.
IRCUMSTANCES MAY THE
se BE DEPARTED FROM WIT!
‘AL of the MANAGER LAND DE
PLANS APPROVED
DARE PLA OO”
iE SILT FENCE FIXED IN
s : WITH MANUFACTURERS SPEC. TO
TEMPORARY SITE FENCING.
52° 55720" 33.711
CONTROL OF THE WIND CARRIAGE OF DUST
TO ENSURE THAT ALL WORKS DO NOT DETRIMENTALLY AFFECT THE AMENITY OF
THE GENERAL NEIGHBOURHOOD AND THE ENVIRONMENT SURROUNDS THE FOLLOWING
MEASURES SHOULD BE ADOPTED:
ALL TOPSOILED AREAS TO BE TREATED BY SURFACE SPRAYING A MINIMUM OF
THREE (3) TIMES PER DAY AT MAXIMUM THREE (3} HOUR INTERVALS, UNTIL
SATISFACTORY GROUND COVER IS ACHIEVED.
10
POST B END POCKET
SUGGESTED STOCKPILE LOCATION. ACTUAL
B LOCATION TO BE DETERMINED ONSITE BY
‘SUPERINTENDENT JOINING SECTIONS FOR
SILT FENCE nis
SEDIMENT MANAGEMENT DETAILS
e 2 TEMPORARY CONSTRUCTION ENTRY/EXIT. REFER TO ENT_MAN ENT _DETA
By Wats eter DETAIL. ALL CONSTRUCTION VEHICLES TO USE THIS 1 PROVIDE SILT F AT THE TOE OF ALL fll
‘ge ENTRY. THE CONTRACTOR SHALL CONTINUOUSLY aR ERS ENCES AT tL FIL
“tgnipoe MONITOR [THE ROAD ADJACENT TO THE SITE FOR ,
2 PROVIDE CHECK DAMS AT TABLE DRAIN OUTLETS AND
og SITE AND IMMEDIATELY REMOVE SUCH MATERIAL. WHERE DIRECTED.
ANY ang OR OTHER MATERIAL CARRIED OFF THE
3. PROVIDE TEMPORARY SILT TRAPS AS DIRECTED.
CONCRETE MASONRY BLOCKS INLET WITH GRATE
(50 SERIES} ‘4. THE ABOVE SILT MANAGEMENT MEASURES ARE TO BE
MAINTAINED UNTIL ACCEPTANCE ‘OFF MAINTENANCE’.
SEDIMENT AND EROSION CONTROL LAYOUT PLAN
eos 2 3 8 5S on
et et et
SCALE 1.100 @ Al
5. THE ABOVE SILT MANAGEMENT MEASURES ARE DESIGNED
ERM (300mm IN ACCORDANCE WITH ‘SOIL EROSION AND SEDIMENT
MIN HEIGHT) CONTROL’ BY THE IEA AND MAY BE VARIED 6Y THE
GEOTEXTILE FABRIC,
BIDUM U34 OR SIMILAR.
— COUNCIL'S REPRESENTATIVE TO SUIT SITE CONDITIONS.
mea WIRE NETTING earn Te BAS BLOCKS
to ALL SIDES OVERFLOW « TURFING AND SEEDING ARE TO BE CARRIEO QUT AS
NOTE: ALL SERVICES RUNOFF WATER SGON AS PRACTICABLE. REFER TO THE SPECIFICATION
f CATED RUNOFF FROM PAD WITH SEDIMENT FOR SEED MIXES AND APPLICATION METHODS.
SITE DESCRIPTION TO BE LOCA DIRECTED TO SEDIMENT TRAP. SEDER FILTERED WATER
LOT 12 on SP179879 ON SITE BY CONTRACTOR
PARISH OF WEYBA PRIOR TO ANY CONSTRUCTION FIELD INLET WITH GRATE
TEMPORARY CONSTRUCTION
ENTRY/EXIT_ SEDIMENT TRAP n.1-s FIELD INLET SEDIMENT TRAP n.t.s
COUNTY OF MARCH
NOTES:
vate OCTOBER 2007
PROJECT:
TITLE: Z
1 Tis & the papsy ot he engee, end aye SX, BARLOW GREGG Swarava_| SEDIMENT AND EROSION PROPOSED DUPLEX nro
ep repeat mas Bee eS scx sussr as CONTROL LAYOUT PLAN, 15 GRANT STREET [een exe |
leftingeneat i acy wey may tescft in lege! action. G FURIE COAST: fuse coast. = NOTES AND DETAILS NOOSA HEADS . .
2, Figured imerios take pececeme ever scled Faodaber 450 CORAL COAST: ASS0GRTEO COWSOTANTS PROJECT-SUBSET-SHEET-REVISION
1 Ney ins 0 mocon bm meeimesres | BURLEIGH DESIGN
BM070201 - C01
Fox ‘etTsus qi
Amendment fox (OT Soe 5s AY COAST:
Amendment Prone 10) (86 1677
Ph: {67} S591 2155 Fox: {07} 5391 2188
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2024 - Approved plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 633 KB (small file)
- File type
No other editions are linked here.