Council archive · source document
Appendix J - Code Assessment · RAL25/0004
No acceptable outcome provided Not applicable.
PO17
Development on land within activity centres with active
frontages are provided with access from a rear lane or
other access streets to reduce potential conflicts with
pedestrians and cyclists.
Open Space Network
PO18 AO18.1 Not applicable.
Development provides for parks, drainage reserves and open Active parkland or open space which links to active
space infrastructure that:- parkland is provided in accordance with the Council’s A 1,000m2 and 1,542m2 area of the subject site
infrastructure network planning; will be dedicated to Council as open space park
(a) provides for a range of passive and active recreation area (see Appendix C for details).
settings, offering a range of informal and formal OR
experiences to the community;
(b) accommodates adequate facilities to meet the needs of AO18.2
the community and is designed to maximise use by the Park contributions are paid in accordance with the
community it serves; applicable infrastructure instrument.
(c) provides opportunities for all age groups and levels of
mobility; AO18.3
(d) is well distributed and contributes to the legibility and Land intended for public open space complements
character of the specific town, village or locality; existing adjacent and surrounding open space areas
(e) creates attractive settings and focal points for the and physical linkages to these areas are provided.
community, designed as attractive and enjoyable,
functional and safe places to meet and recreate; AO18.4
(f) benefits the amenity of adjoining land uses; Open space is provided adjacent to waterways, with
roads servicing the linear parkland and lots located on
(g) facilitates the retention and protection of ecologically
the opposite side of the road to the waterways.
important areas, wetlands, waterways, drainage lines and
native habitat areas, their associated buffers, ecological
AO18.5
linkages and other natural and cultural features;
A park has direct road frontages of a minimum of 25%
(h) incorporates appropriate measures for stormwater and
of the total allotment boundary of the park to provide
flood management;
physical access and visibility.
(i) is cost effective to maintain; and
(j) is dedicated as public land in the early stages of the AO18.6
subdivision. Public open space has good connectivity for users via
pedestrian and cycle paths.
AO18.7
Landscaping is designed to create aesthetically pleasing
open space areas and to suit the type, setting and
purpose of the particular park.
AO18.8
Active parkland in all areas other than the Low impact
industry zone and Medium impact industry zone will
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix J - Code Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 430 KB (small file)
- File type
No other editions are linked here.