Negotiated Decision Notice OPW26 0033 (As Published)

of 22
                      Landscape Works
               27.    Landscape works must be supervised, undertaken and certified by qualified persons*. All
                      works must be completed in accordance with this Decision Notice.
                      (*) Refer to Advisory Note
               28.    Public amenity street trees (*) must:
                      a.      Be certified to meet AS2303:2018 Tree stock for landscape use.
                      b.      Be located in accordance with engineering requirements for safe vehicle and
                              pedestrian sight lines.
                      c.      Be located in accordance with the approved Landscape Design & Rehabilitation Plan
                              listed in this Decision Notice or otherwise approved by Council.
                      (*) Refer to Advisory Note
               29.    Turfed areas must be free of pest, diseases and weeds and level with adjoining surfaces.
                      Rehabilitation Works
               30.    Rehabilitation works must be supervised, undertaken and certified by qualified persons (*).
                      All works must be completed in accordance with this Decision Notice.
                      (*) Refer to Advisory Note
               31.    The Rehabilitation supervisor must annually, for a minimum period 12 months:
                      a.      Organise formal inspection with Council’s delegate.
                      b.      Submit to Council (with each inspection request) a Rehabilitation Status Report (written
                              and photographic), mapping:
                              i.       The condition of the regeneration area.
                              i.       Detailing works undertaken in the previous year.
                              ii.      The percentage cover of indigenous recruitment.
                              iii.     Measuring the works against the approved Vegetation Covenant Area –
                                       Rehabilitation Management Plan.
               DURING CONSTRUCTION
                      Engineering
               32.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               33.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.




                                                                                                       Page 10 of 22
Document Set ID: 25209919
Version: 4, Version Date: 02/10/2026

Log in to download the original (Negotiated Decision Notice OPW26 0033 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.