Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Negotiated Decision Notice OPW26 0033 (As Published)

of 22
               77.    Prior to requesting an On Maintenance inspection, the following information (prepared by
                      respective qualified persons* and certifying compliance with approvals) must be submitted
                      to Council:
                      a.      All required bonds.
                      b.      Landscaping certification.
                      c.      AS2303:2018 Tree stock for landscape use certification.
                      d.      Fauna Report documenting the findings and outcome of the fauna protection works
                              undertaken.
                      e.      Bushfire management certification.
                      Off Maintenance
               78.    Prior to requesting an Off Maintenance inspection, the developer must provide a written
                      request for the Off Maintenance inspection and include certifications from the Project Arborist
                      that all trees in public land have been inspected and rectification works for public safety and
                      longevity of the tree/s has been completed.
               79.    Off Maintenance will only be accepted after all works are confirmed in good order including,
                      but not limited to:
                      a.      Rectifying any damaged grassed areas.
                      b.      Topdressing to grassed areas.
                      c.      Remulching, fertilising and aeration of garden areas.
                      d.      Replacement of plant material.
               80.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements
                      b.      submitted certification falsely states works comply with approval requirements.
                      Final Inspection
               81.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.
               5.     REFERENCE DOCUMENTS

               Not applicable.
               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      General Advisory Notes
               1.     As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawings RS-049 and
                      RS-050.




                                                                                                       Page 18 of 22
Document Set ID: 25209919
Version: 4, Version Date: 02/10/2026

Log in to download the original (Negotiated Decision Notice OPW26 0033 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.