Original source · versioned page text
Appendix C - Amended Engineering Plans
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 10, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn3.3 Proposed Water Reticulation Works The proposed extension to the adjoining Manufactured Home Estate will be serviced by the existing water infrastructure provided by the Palm Lake Resort’s existing stages that are currently being constructed. It is envisaged that the water reticulation detailed design will be undertaken by a Pinnacle during the detailed design phase of the project. Engineering services layouts detailing the proposed services for the site is included in Appendix C. Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report Page 10 of 21 File Location: 180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.