Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Appendix C - Amended Engineering Plans

Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4 Sewerage Reticulation

4.1     Existing Infrastructure

A review of the DBYD data has revealed the location of existing sewerage reticulation within the Trading Post
Road and Prospect Place road reserves to the south of the subject site.

It is understood that an additional DN160mm PE sewerage main is located within an existing easement which
runs along the subject site’s eastern boundary.       This sewer grades to the north and joins the existing
sewerage reticulation network to the east of the subject site.

The design documentation for the existing Palm Lake Resort stages is included within Appendix E with the
DBYD data included within Appendix D.


4.2     Proposed Demand

The demands on the existing sewer infrastructure were established using the methods described in SEQ
WS&S D&C Code.               These demands were used to determine the consumption rates for the proposed
development. The sewer demand factors and flow parameters have been taken from Table 10 and Table
A17, respectively, to determine the consumption rates for the proposed development.

The results are presented in Table 4.1 below.

Table 4.1: Residential Sewerage Demands (Palm Lake Resort, Cooroy – Stage 6 Only)

                          Design Parameter                                 Stage 3 Sewerage Values
 Area of Land                                             0.5796 Hectare
 Development Type                                         Multiple Housing – Type 3 Retirement and Special Needs
 ET                                                       10
 EP/ET Conversion factor                                  2.7
 EP                                                       27 EP
 Average Dry Weather Flow (ADWF)                          210 L/EP/Day
 C2 (C2= 4.7 x EP-1.05)                                   3.33
 ADWF                                                     5.670kL/day or 0.066L/sec
 PDWF (C2x ADWF)                                          18.853kL/day or 0.218L/sec
 PWWF (5 x ADWF)                                          28.350kL/day or 0.328L/sec
 Design Flow                                              0.328L/sec

Based on the above assessment it is envisaged that the proposed development will place a demand of
0.328L/sec during PWWF on the downstream sewerage network.

Engineering services layouts detailing the proposed sewerage infrastructure is included in Appendix C.




Palm Lake Resort, Cooroy – Stage 6 – Engineering Services Report                                     Page 11 of 21
File Location: 180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx
Log in to download the original file

Appendix C - Amended Engineering Plans.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.