Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

Appendix C - Amended Engineering Plans

Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.

of 74

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 3, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Document control
 Rev    Date issued        Review             Approved        Approved on          Revision type
 01     10-November-2017   A. Cresswell       B. Popa         10-November-2017     Issued for comment
 02     12-November-2017   A. Cresswell       B. Popa         12-November-2017     Issued for use
 03     8-March-2018       A. Cresswell       B. Popa         8-March-2018         Minor revisions




Distribution of copies
 Revision      Quantity             Distribution
 01            1.pdf                Palm Lake Works Pty Ltd
 02            1.pdf                Palm Lake Works Pty Ltd
 03            1.pdf                Palm Lake Works Pty Ltd




 Printed:                  8 March 2018

 Last saved:               08/03/2018 11:52

                           P:\Projects\PEG0360_20 Trading Post Road, Cooroy\03 Reports\01 Engineering
 File name:
                           Report\180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx

 Author:                   Bogdan Popa
 Project manager:          Andrew Cresswell

 Name of organisation:     Pinnacle Engineering Group

 Name of project:          Palm Lake Resort, Cooroy
 Name of document:         180308_PEG0360_20 Trading Post Rd, Cooroy_ESR_R003.docx

 Document version:         REV 03

 Project number:           PEG0360
Log in to download the original file

Appendix C - Amended Engineering Plans.pdf · 14.6 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.