Original source · versioned page text
Appendix C - Amended Engineering Plans
Attached to the e-mail MCU17/0551 - Information Response - 20 Trading Post Rd Cooroy.
The original of this document is very large (14.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnTable of Contents
1 Introduction............................................................................................................... 6
1.1 Scope ......................................................................................................................................................... 6
1.2 Site Description........................................................................................................................................... 6
1.2.1 Site Location................................................................................................................................. 6
1.2.2 Site Features and Topography ..................................................................................................... 6
1.2.3 Proposed Development ................................................................................................................ 7
2 Stormwater Drainage ................................................................................................ 8
2.1 Existing Drainage System........................................................................................................................... 8
2.2 Proposed Drainage Works.......................................................................................................................... 8
3 Water Reticulation .................................................................................................... 9
3.1 Existing Infrastructure ................................................................................................................................. 9
3.2 Development Water Reticulation Demand .................................................................................................. 9
3.3 Proposed Water Reticulation Works ......................................................................................................... 10
4 Sewerage Reticulation............................................................................................ 11
4.1 Existing Infrastructure ............................................................................................................................... 11
4.2 Proposed Demand .................................................................................................................................... 11
5 Bulk Earthworks ..................................................................................................... 12
5.1 Design Requirements ............................................................................................................................... 12
5.2 General Site Earthworks ........................................................................................................................... 12
5.3 Retaining Structures ................................................................................................................................. 12
5.4 Acid Sulphate Soils ................................................................................................................................... 12
5.5 Erosion and Sediment Management......................................................................................................... 12
6 Electrical and Telecommunications ...................................................................... 13
7 Impacts on Local Infrastructure and Likely Upgrades ......................................... 14
8 Reference Documentation ..................................................................................... 15
Appendices
A Proposed Development Plans
B Existing Features and Topography
C Engineering Layouts
D DBYD
E Palm Lake Resort, Cooroy Design Drawings
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.