                      The design of the proposed effluent disposal system is to:—
                      a.      be prepared by a registered civil engineer engaged by the applicants,
                      b.      be approved by Council’s engineer prior to the issue of a Building Approval.
               8.     The Applicants will arrange for the construction and installation of the said package treatment
                      plant and absorption field (or irrigation system subject to the Shire Engineer’s approval) to
                      be supervised by a registered civil engineer. On completion of the work, the developer’s
                      engineer shall certify that the system has been installed as approved by the Council’s
                      Engineer.
               9.     The Applicant’s civil engineer shall design the said package treatment plant so as to ensure
                      that it is accessible by vehicle for both maintenance and sludge removal. An area is also to
                      be provided for the storage of chemicals and equipment and provision is to be made for
                      cleansing this area and such equipment employed. The detailed design necessary to comply
                      with this requirement is to be submitted to and approved by the Council’s Engineer prior to
                      the issue of a Building Permit.
               10.    The Applicants are to be responsible for ensuring the proper and effective maintenance of
                      the package treatment plant and absorption trench field. Prior to the occupation of the
                      buildings, the Applicants will:—
                      a.      Enter into a permanent maintenance contract with the manufacture of the package
                              plant and proof of this contract shown to the Shire Engineer.
                      b.       Enter into a legally binding agreement with the Council whereby the Council’s officers,
                              servants or agents shall at all times be at liberty to enter upon the subject land with or
                              without vehicles, plant and equipment for the purpose of inspecting the package
                              treatment plant and absorption field.
                      c.      Enter into a legally binding agreement with the Council whereby the Council shall be
                              paid for every inspection as is reasonably required in accordance with the Council’s
                              duties at the rate of $50.00 per inspection (or other amount as determined by Council
                              resolution); such agreement to provide that such inspection fee shall be paid quarterly
                              and increase correspondingly with the annual percentage increase in the Consumer
                              Price Index from the date of this approval.
               11.    The Applicants will construct an underground drainage system designed to the requirements
                      and standards of the Council’s Engineer so as to dispose of all stormwater runoff which falls
                      upon the subject land or is naturally concentrated upon it. All stormwater must be collected
                      upon the subject land and connected into the system. Such drainage system shall extend
                      from the subject land to the existing natural creek to the north where a dissipator type outlet
                      also approved by the Council’s Engineer shall be provided by the Applicants at the proposed
                      outfall to the creek. The Applicant’s knowledge that the prior approval of the Land
                      Administration Commission shall be necessary before the Council’s Engineer can finally
                      approve this method of disposal. The Applicants will submit the necessary documentation
                      from the abovementioned drainage system to the Council prior to the issue of a building
                      permit and a building permit will not be issued until the documentation has been approved
                      by the Council’s Engineer.
               12.    The proposed beach accesses are to be of board and chain construction with the locations
                      and construction principles approved by the Beach Protection Authority prior to works
                      commencing. The access at the north of the site shall connect into the existing informal beach
                      accesses through the Council reserve. The existing accesses from this point to the beach
                      shall be upgraded to the standards and requirements of the Beach Protection Authority and
                      Council.
               13.    Submission to and approval by Council of building plans in accordance with the Building Act,
                      Council’s By-laws and Policies, and generally in accordance with the plan approved in this
                      Consent and the Shire of Noosa Town Planning Scheme apart from where amendments are
                      required or dispensations have been granted in conjunction with this Consent.



                                                                                                          Page 3 of 9
Document Set ID: 24800867
Version: 4, Version Date: 25/05/2026

Used in these records

About this file

File size
170 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval 51989 294 03 (As Published).pdf · 170 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.