Sunshine Butterflies - Attachment D - 010816-2
Attached to the e-mail Development Application - Geotech report & Sunshine Butterflies flyer 2 of 2 MCU16/0090.
OUR BACKYARD
468 MCKINNON DRIVE, COOROIBAH
An unsaturated soil depth of at least 1.2 m (i.e. depth to rock or wet soil) is recommended for Primary
effluent, with this depth of soil available in the proposed area. All other setbacks are achievable, including
the required 50 m setback from the existing dam. There is also sufficient room for a 100% reserve area to
cater for full future replacement of the beds, if required.
7.3.3 System Construction
Construction of the wastewater land application system must be carried out in accordance with AS1547:2012
and Noosa Council requirements. The proposed bed construction is illustrated in Text Figure 9.
450 mm
500 mm 1000 mm 500 mm
Text Figure 9: Proposed absorption bed construction
In order to prevent any adverse impacts on the water quality from effluent disposal, the following shall be
implemented:
Install surface diversion drainage on the up slope side of the land application area in order to divert
surface water and shallow subsurface seepage flows away. Such drainage should penetrate to a
minimum depth of 0.3 m BGL.
Maintain orchard trees (as proposed) and/or maintain grasses, reeds and/or small shrubs in the
spaces between the absorption beds. Preference should be given to native plant species endemic
to the local area, which are suitable for mostly wet soils and are tolerant of nutrient loads (e.g. native
riparian vegetation).
Erect signage at the boundaries of the area in at least two places in accordance with Council
requirements to warn people regarding the presence of wastewater pipes.
Detailed design of the effluent disposal system must be carried out by a Registered Evaluator once the
building design is finalised.
7.3.4 Maintenance and Inspection
To comply with Noosa Council requirements, the following management and inspection shall be
implemented once the effluent disposal system is established:
Continuous monitoring by the property owner for any signs of system failure such as septic odour,
seepage, soil and/or plant discolouration.
Should any signs of system failure be observed by the property owner, a licensed plumber shall be
contacted immediately to arrange for the necessary repairs.
Quarterly inspection and pump-out (if necessary) of the septic tank. Depending on usage, septic
tank pump-out is generally required every three to five years.
8.0 LIMITATIONS
Your attention is drawn to the document “Limitations”, which is included in Appendix C of this report. The
statements presented in this document are intended to advise you of what your realistic expectations of this
report should be, and to present you with recommendations on how to minimise the risks associated with the
services provided by Tectonic for this project.
4 May 2016
Report No. 16081-001-Rev0 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.