                                          PROPOSED SUBDIVISION
                                          41 TALLOWWOOD PLACE, BLACK MOUNTAIN

            6.2.3           Batter Slopes
            Unsurcharged cut batters to a maximum of 2 m deep may be temporarily formed at 1V:1H in the natural
            residual soils and weathered phyllite, provided groundwater is not encountered. Steeper temporary batters
            may be permissible in low strength (or stronger) weathered phyllite subject to an assessment during
            construction by a geotechnical RPEQ. Where space limitations occur or the above temporary batter slopes
            are not achievable, installation of temporary retention would be required.

            Permanent batters in very stiff (or stiffer) residual clays and very low strength (or stronger) phyllite up to 2 m
            deep may be formed at 1V:2H. Steeper and higher batters may be permissible in low strength (or stronger)
            phyllite subject to an assessment during construction by a geotechnical RPEQ. Permanent batters up to 1 m
            high in future controlled fill on slopes <10° may be formed no steeper than 1V:2.5H. All fill on slopes
            exceeding 10° must be supported by engineer designed and certified retaining structures, unless assessed
            and approved by a geotechnical RPEQ. Permanent batter slopes will require some form of erosion
            protection such as revegetation by landscaping (e.g. topsoil, Jute matting and planting).

            Placement of heavy ‘builders plastic’ or filter ‘cloth’, pinned to batters may be required if heavy of prolonged
            rainfall occurs during construction. Exposure of temporary batters should be minimised in order to limit
            shrinkage cracking in clayey soils and potential development of temporary instability.

            6.2.4           Filling
            The high plasticity cohesive (clay/silt) soils, where free of deleterious materials (e.g. organics, oversize etc.),
            could be reused as structural fill, or as non-structural fill (e.g. in landscaping areas, batters, etc.). It should
            be noted that reuse of high plasticity soils may have adverse implications for pavements (low CBR values)
            and future house construction (high reactivity resulting in Class H2 or higher site classification). Site won
            clay/silt materials should be placed in the lower fill layers at least 0.5 m below finished platform levels, where
            possible.

            It should also be noted that due to the high silt content the natural soils would develop poor engineering
            qualities when wet of optimum moisture content and would be difficult to handle and place during
            earthworks, which should be considered during earthworks planning.

            The weathered phyllite could be used as structural fill provided the materials can be broken down to suitable
            particle sizes (<100 mm). Depending on the method of excavation used, re-use of any medium strength (or
            stronger) weathered phyllite as structural fill may not be possible without specialised processing (e.g. use of
            a mobile crushing plant).

            Should importation of fill be required, it is recommended that such fill should comply with the following:

                     Minimum CBR of 10%
                     Maximum plasticity index of 15%
                     Maximum particle size of 100 mm

            All structural fill should be compacted at moisture contents within the range of ±2% of OMC for Standard
            Compaction. Fill should be placed in 250 mm thick (loose thickness) layers and be compacted by repeated
            rolling to achieve a dry density ratio of at least 95% of the maximum Dry Density Ratio (DDR), or 100% DDR
            based upon the Standard Compaction method within 0.3 m of pavement subgrades.
            Confirmatory compaction testing must be carried out at regular intervals. A minimum of two tests per vertical
            lift is recommended where structural fill heights are to exceed 300 mm. Further details for control and testing
            of fill are given in Australian Standard AS 3798-2007 Guidelines on Earthworks for Commercial and
            Residential Developments. It is recommended that Level 1 geotechnical inspection and testing be
            conducted for all Operational and Building Works filling where fill heights exceed 0.5 m.

            Due to the sloping nature of the site, all fill must be ‘benched’ into the natural slope, over-filled by 0.5 m
            (horizontally) and then trimmed back to the well compacted material.




             22 May 2023
             Report No. 23099-001-Rev0                               15

Document Set ID: 22826802
Version: 1, Version Date: 23/02/2024
Log in to download the original file

Reference Documents.pdf · 13.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.