PROPOSED SUBDIVISION
41 TALLOWWOOD PLACE, BLACK MOUNTAIN
6.3 Building Foundations
6.3.1 Site Classification
Based on the results of the investigation, preliminary characteristic surface movements (‘ys’) for the natural
soil profile are estimated to range up to 40 mm, equivalent to Class H1 in accordance with AS 2870-2011
Residential Slabs and Footings. As mentioned previously, surface cracking was noted across the proposed
new building area which appeared to be related to soil shrinkage due to drying.
It should be noted that the predicted order of movement is based on the existing natural soil profiles (i.e. no
additional cutting or filling), and moisture content changes within soils due to normal seasonal moisture
variations only.
Reactive soil movements and site classification should be assessed by the footing design engineer at
building stage to consider the extent of earthworks across the proposed new building area, together with any
retained trees (trees located near footings can influence the potential ground movement, and result in more
severe site classifications). A site classification ‘soil test’ may be required prior to building works to confirm
the site classification and footing design parameters.
It should be noted that the placement of highly reactive clay fill may have an adverse impact on the site
classifications.
Due to the clayey nature of the site soils, it would be prudent to implement the following practices to prevent
changes in soil moisture:
Prevent drying of the clay soils during construction by minimizing exposure. This may be achieved
by measures such as covering subgrades with HDPE (‘black builders plastic’) or ‘Bidim’, and
placement of ‘blinding’ layers across the excavation subgrade and footing bases.
Install and maintain temporary drainage to prevent saturation of the site during construction.
Seal the ground surface around the building perimeter (e.g. concrete or paved pathway).
Plant shrubs/trees at least a distance from the building equal to the mature height of the shrub/tree.
Maintain stormwater drains to prevent overflow into soils and repair any damaged drains
immediately.
6.3.2 Footing Design
All footings supporting the proposed new residence and ancillary structures (including all retaining walls) must
penetrate any fill and natural soil to found at least 0.3 m into very low strength (or stronger) phyllite. Based on
the test pits, footing depths are anticipated to range between about 1.5 m and 2 m BGL (below existing
ground levels), however, depths are likely to be shallower in areas of future cut and deeper in areas of future
fill.
The subsurface conditions encountered indicate that steel reinforced concrete bored piles or ‘bucket piers’ will
generally be required unless excavations expose the required foundation materials at or near the subgrade.
High-level footings and steel reinforced concrete bored piles (or similar) founded at least 0.3 m into very low
strength (or stronger) weathered andesite may be designed using an allowable bearing pressure 400 kPa
(footings) and 600 kPa (piles), respectively.
It is recommended that the bases of all footings should be formed level/horizontal to ensure loads are well
keyed into the slope. Footing design should also account for potential soil reactivity. A suitably qualified and
experienced geotechnical RPEQ should inspect the footing excavations to confirm appropriate foundation
materials and cleanliness prior to pouring concrete.
All footings should found such that they are not adversely affected by any adjacent excavations, trenches, or
retaining walls that are not designed to support building loads. Where footings are located within a horizontal
distance of 1.5H (H being the batter height) of any cut or fill batter crest, these footings must be founded at a
depth level with the toe of the batter. Footings should found at least below a plane extending 1 m horizontally
from the base of trenches/excavations/retaining walls, then rising up at 1V:1H, as illustrated in Text Figure 14
overleaf.
22 May 2023
Report No. 23099-001-Rev0 16
Document Set ID: 22826802
Version: 1, Version Date: 23/02/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.