Skip to the record
Search everything, all in one place.

Council archive · source document

07/0568 - MCU - Detached House [As Published] · 132007.568

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997

Works in tidal areas, coastal
management districts and fish habitat
areas

If you answered YES to Q5, and ticked any
boxes in Q6), your application is required to be
assessed against and must comply with the Wad
Rivers Code.

If you answered YES to Q6 and ticked bax j}in -
6, your application is required to be referred to
the EPA.

Note: If specified works are proposed in.a local”
goverment area, it is prescribed tidal work — the
felevant locat government will be the”
assessinent manager with the EPA as 2
concurrence agency

if you answered YES to Q6, and ticked box ii) or
i) in Q6, your application requires referras to
OPIF.

ILyou answered NO to Q5 and Ucked box I} in
Q6, the application will not be accapted.

If you answered NO to 5, ticked bax ii} in Q6
and the development is necessary to install
authorised works or infrastructure where a
development permit is not’required, or if a
fequired permit is held, the application must be
assessed against and must comply with the Wild.
Rivers Code. Applications for purposes other
than spectied works or as described above will"
nol be accepted,

If you answered NO at Q5 and ticked box fil) in,
Q6, the application may be made if the works are’
ina PA. These applications must be assessed
* against and must comply wilh the Witd Rivers

Code. The application witl not be accepted If the
development is proposed to be located in a HPA.
For more information about specified works refer
0 Guide 27

IDAS Assessment Checklist, Version 19.0, 2 March 2007
Is the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)

LINO (yes

The application is for one or more of the following:

O i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1), OF

O ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part O2 of Form 1), OF

O iii} Building or operational works in a fish habitat area {ensure you have completed Part O2 of Form 1).

 

 

 

Residential, commercial or industrial |7, Is the application for residential, commercial or industrial development in a designated urban
development area?
{f you answered YES to Q7, your application is
not subject to wild river requirements. Provided Oo NO Oo YES
there are no other aspects of this development .
that require assessment against the relevant wild icati ‘ 4 j i ; i .
fiver declatation or Wil Ravers Code, you do at 8. If NO, does the application for residential, commercial or industrial development involve:
need to complete the remaining questions in (1) a material change of use made assessable in a local government planning scheme
Section 2 (ensure you have completed Part D of Form 1); or
{f you answered NO to Q7 and ticked either box ws . . . .
i) or il} in 08, the assessing agency is the 0 ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
relevant local government. The apptication must of Form 4).
be assessed against and must comply with the
Wild Rivers Code.
Animal husbandry activities 9. Does the application involve a material change of use for animal husbandry activities (as defined
picall ki ry
I you answered YES to Q9 your application under the Wild Rivers Act 2005) in a PA?
requires assessment agains! and musi comply
with the Witd Rivers Code. (no -LD YES (ensure you have completed Part R of Form 1)
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted If proposed in a
HPA. For more details and a definition of animat
husbandry activities see the Wild Rivers Act
20085 and refer to Guide 27.
Agricultural activities 10. Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
i yeu answered YES to Q10, your epilation aPA?
requires assessment against and must comply
with the Wild Rivers Code. oO NO O YES (ensure you have completed Part Q of Form 1)
The assessing agency is NRW.
11. IfYES is the application for:

Note: Applications for agricultural activities wit
not be accepted if proposed in a HPA. For more
details and a definition of agricuftural activities
see the Wild Rivers Act 2005 and refer to Guide
a.

The production of fodder in a PA, and pasture
improvernent using low impact soil-disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.

 

O i) a material change of use; or
L) ii) operational works.

 

Page 11

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0568 - MCU - Detached House [As Published].pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.