07/0568 - MCU - Detached House [As Published] · 132007.568
INTEGRATED PLANNING ACT 1997
Works that take overland flow water | 12.
The relevant wild river dectaration will state
works that take overland flow water are either
Self assessable or assessable, or are exempt
from wild river requirements. 13.
if you ticked Q13 i}, your application must be
assessed by NRW against thé Wild Rivers Code.
and must comply wilh the code, .
If you ticked Q13 ii) an application is not required
to be made however the works mus! comply with
the relevant self-assessable section of the Wild '
Rivers Code, otherwise the works become
assessable development for which an application
‘Is required and must be assessed by NRW
‘against the relevant part of the Wild Rivers Code
and must comply with he code,
If you ticked Q13 iii) your application is not
- Subject to wild river requirements.
Applications for development that is other than
that stated fo bo assessable, salf-assessabie oy
exempt will not be accepted.
Works that interfere with overland 14.
-flow water
The relevant wild river declaration will state
works that interfere wilh overland flow water that
are either self assessable, assessable or exempt | 15.
from wild river requirements.
it you ticked Q15 |), your application must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
It you ticked Q16 ii) an application is not required
to ba made however the works mus! comply with
the ralevant self-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW.
against the relevant pan of the Wild Rivers Code
and must comply with the code.
If you ticked Q15 iii) your application is not
Subject to wild river requirements,
Applications for develapment that is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Waterway barrier works 16.
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
lf you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
IDAS Assessment Checklist, Version 19.0, 2 March 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
LINo oO YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(71) assessable works
(J ii) self-assessable works
(J ili) exempt works
Does the application involve works that interfere with overland flow water in a FMA?
E]Nno [DYES (ensure you have completed the relevant Part K of Form )
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
CJ ii) selt-assessable works
C1 iii) exempt works
Does the application involve building or raising waterway barrier works in a PA?
(no (11 YES (ensure you have completed Part O3 of Form 1)
Aquaculture (non ERA) 17.
Applications for aquaculture in a HPA will not be
accepted.
If you answered YES to Q17, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Does the application involve aquaculture in a PA?
Oo NO oO YES {ensure you have completed Part O: of Form 1)
Works that interfere with water in a 18.
watercourse
Note: If the development is proposed In a HPA,
apptications for all works that interfere with water
in a watercourse (including dams or weirs,
stream reatignment of stream diversion) will not 49,
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
If you icked box ii} In Q19, your apptication will
fol be accepted.
Note: Operational works outside a HPA or
nominated waterway are not subject to wild
river requirements.
More information and locations of nominated
waterways is available by contac! NRW,
accessing the department's website
www.nnw.cid.gov.au oF contacting the
department by email on;
wild [email protected] the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
(No Cyes {ensure you have completed the relevant Part K of Form 1)
If YES, .
O i) The application is for an instream dam or weir; or
(ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0568 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.