Original source · versioned page text
2014-06-26 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 26 JUNE 2014
(b) crossfalls and gradients in accordance with Australian Standard AS/NZS
2890.1:2004 - Parking Facilities
(c) garages, including door openings, in accordance with section 5.4 of
Australian Standard AS/NZS 2890.1:2004 - Parking Facilities
Pedestrian
21. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must
include in particular a 2 metre wide concrete footpath within the road verge for
the entire length of the site’s frontage to David Low Way.
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be:
(a) generally in accordance with drawing number 17011-SW1 B prepared by
SCG Consulting Engineers
(b) undertaken in accordance with an Operational Works approval.
Electricity and Telecommunication Services
23. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
24. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Earthworks and Retaining Walls
25. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to
Council.
Damage to Services and Assets
26. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
ENVIRONMENT
Waste Storage
27. The developer must provide waste storage and disposal facilities in accordance
with Planning Scheme Policy 9, Waste Management, including an external
imperviously paved area correctly sized for all refuse and recycling containers
and suitably screened from public places and neighboring properties.
Page 12 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.