ORDINARY MEETING AGENDA 26 JUNE 2014
28. A bin wash area is required with a cold-water tap, hose and drain outlet
connected to sewer, via a bucket trap. The drain outlet must be designed to
prevent storm water entry to the sewerage system which can be achieved by a
bunded area, with a nib wall height of 100mm maximum, enclosing a wash area
of 700mm x 700mm minimum (max 0.7m²). Alternatively the waste area can be
roofed, or any other appropriate design approved by council that would prevent
storm water entry to the sewer.
Noise
29. Written certification is required from a suitably qualified person confirming that
sound pressure levels from all mechanical plant and equipment comply with the
following :
(a) Air-conditioning and Refrigeration
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
(b) Pumps
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
Assessment and certification is required immediately after installation of the
equipment and prior to any occupation of the building. All equipment should be
operating at the same time to test the overall noise level created, with the
measurement location at either the residential boundary or outside the most
exposed part of an affected building - whichever is the closest to the
plant/equipment.
30. The certification must be submitted to Council, which certifies that operational
noise from any fixed plant and equipment complies with the requirements of this
Decision Notice.
UNITYWATER
31. Reticulated water supply and sewerage must be provided to the development.
32. Construction activities must not impede the access of Unitywater or Fire
Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer
access chambers).
33. The fire-fighting demand on Unitywater’s water supply system from the
development must not exceed 15 litres per second.
34. The existing 150mm diameter asbestos concrete watermain in David Low Way
must be replaced for the full frontage of the development site with DICL pipes.
The replacement works must be completed prior to placing construction
materials/site offices over or adjacent to the water main alignment.
35. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Additional water meters must be installed for
each title of a community title or sub-lease scheme. Meters must be Unitywater
approved, installed in accordance with Unitywater requirements and remain
accessible at all times for reading and maintenance purposes.
36. Water meters must be located on alternative boundaries to electrical pillars.
Page 13 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.