ORDINARY MEETING AGENDA                                                             26 JUNE 2014


         Preparation of a Preliminary Construction Management Plan
         6.    A preliminary Construction Management Plan must be submitted with the
               Operational Works application and must address the following:
               (a)    traffic management during all aspects of the construction phase including:
                      (i)     a Traffic Management Control Plan in accordance with the Manual
                              of Uniform Traffic Control Devices (MUTCD) detailing all temporary
                              signage and traffic control measures prior to construction
                      (ii)    maintenance of safe pedestrian access for the areas affected by the
                              works during and after daily construction has ceased
                      (iii)   proposed fencing to the site during the construction phase of the
                              development
                      (iv)    provision for worker car parking
               (b)    maintenance and protection of water quality and existing drainage lines
                      through the construction site, through the implementation of appropriate
                      erosion and sediment control measures
               (c)    works programme identifying key components of the works and their
                      respective durations
               (d)    establishment of a communication protocol with the general public,
                      adjoining owners, emergency services and local businesses to advise of
                      agreed construction times, impacts on traffic, services and other relevant
                      issues
               (e)    identification of complaint management procedures including:
                      (i)     contact details for the on-site manager
                      (ii)    dispute resolution procedures
               (f)    it is acknowledged that the preliminary Construction Management Plan
                      will be a draft document requiring finalisation upon appointment of the
                      Principal Contractor employed to construct the works and a final
                      document will be required to be submitted at the Pre-Start Meeting for the
                      project.
         Unitywater
         7.    Connection to Unitywater live water mains and the Unitywater live sewer system
               must be undertaken by Unitywater at the applicant’s cost.
         8.    A 150mm diameter watermain is located within the road boundary fronting the
               development site in David Low Way. Construction works, heavy traffic crossing
               the main, excessive vibration and excavation close to the main may cause
               damage to the pipe. Extreme care is required when working close to this
               infrastructure. All costs associated with repair, replacement or alteration of
               infrastructure must be met by the applicant.
    B.   Find the following are sufficient grounds to justify the decision despite the conflict with
         the Planning Scheme:
         1.    The proposed small low cost permanent and visitor accommodation provides
               housing diversity ideally located in close proximity to the Peregian Beach
               neighbourhood centre and other social infrastructure.
         21.   The building design is a well-articulated coastal building style that presents as
               domestic scale and integrates well with development in the surrounding area.



                                                                                    Page 15 of 34
Log in to download the original file

2014-06-26 Ordinary Meeting Agenda(PDF, 583KB).pdf · 597 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.