ORDINARY MEETING AGENDA 26 JUNE 2014
37. Buildings and other structures must maintain a minimum clearance of 1.5
meters from Unitywater sewer mains, and 1.0 meter from a sewer manhole
chamber or sewer inspection opening.
38. The level of the existing sewer manholes must be adjusted to suit the proposed
finished surface levels. Work must be undertaken by Unitywater at the
applicant’s cost or by the applicant’s private contractors following submission to
Council of an Operational Works application and approval of the application.
39. Easements of between 3 and 10 metres must be provided over all Unitywater
sewers located within property boundaries in accordance with the SEQ
standards. Easements shall be centred over the pipe. Easement terms shall be
the most current registered dealing held by the Department of Natural
Resources & Mines and shall not be altered or amended.
40. Storm water retention systems and gross pollutant traps must maintain a
minimum clearance of 1.5 meters from Unitywater water supply and sewerage
infrastructure.
41. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature,
and suitable approved varieties.
42. Construction works undertaken in the vicinity of Unitywater water supply or
sewerage infrastructure must not adversely affect the integrity of the
infrastructure. All costs associated with repair, replacement or alteration of
infrastructure must be met by the applicant.
ADVISORY NOTES
The following notes are included for guidance and information purposes only and do
not form part of the assessment manager conditions:
Development Compliance Inspection
1. Prior to the commencement of the use, please contact Council's Development
Audit & Response Unit to arrange a Development Compliance Inspection.
Infrastructure Charges
2. This Development Permit will trigger an “Adopted Infrastructure Charge Notice”
(if applicable) to be issued in accordance with Council’s “Adopted Infrastructure
Charges Resolution” under the State Planning Regulatory Provision (Adopted
Charges) and the Sustainable Planning Act 2009.
Qualified persons – Landscaping
3. For the purpose of preparing a Landscape Plan, a qualified person is
considered to be a landscape architect, landscape designer and/or horticulturist
with a minimum of 3 years current experience in the field of landscape design.
Building and Construction Industry (Portable Long Service Leave) Levy
4. The QLeave levy must be paid prior to the issue of a development permit where
it is required. Council will not be able to issue a Decision Notice without receipt
of details that the Levy has been paid. QLeave contact: 1800 803 481 (free
call) or (07) 3212 6855.
Co-ordination of Operational Works Assessment
5. Additional application fees apply to Operational Work applications where the
different aspects of the works are lodged separately. Significant savings in
application fees will result if all works are lodged in a single application.
Page 14 of 34