ORDINARY MEETING AGENDA 26 JUNE 2014
(b) bioretention devices which:
(i) are designed generally in accordance with IPWEQA Standard Drawing
No. WSUD-001.
(ii) incorporate a coarse sediment forebay (in addition to the required filter
media surface area), which is sized in accordance with the latest version
of the Water Sensitive Urban Design Technical Design Guidelines for
South East Queensland and designed generally in accordance with
IPWEQA Standard Drawing No. WSUD-005.
(iii) have safe, unobstructed and all weather access from the road frontage
for maintenance purposes, particularly for the coarse sediment forebay.
(iv) are provided with a high flow bypass to ensure that flows which exceed
the treatment capacity of the device are bypassed in order to avoid
damaging of the filter media or subjecting the filter media to excessive
sediment loads.
(v) are provided with a free-draining outlet from the sub-soil drainage system.
(vi) treat stormwater from all developed catchments (including roof and
carpark catchments) prior to discharge.
37. Permanent educational signage must be erected to educate the customers to the
development about the function of the bioretention device(s). The dimensions,
standard, presentation and location of the educational signage must be in
accordance with an Operational Works approval. *(Refer to Advisory Note)
Vegetated Devices
38. All stormwater quality treatment devices must be maintained in accordance with the
Water by Design (2009) Maintaining Vegetated Stormwater Assets (Version 1). The
approved Operational Works drawings for the stormwater quality treatment system
and detailed life cycle costing of the system must be attached as an addendum to this
document. Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
Rainwater Harvesting
39. Operating rainwater collection tanks must be provided for the development. The
tanks must be provided in accordance with an Operational Works approval and must
include in particular:
(a) the details identified in section 5 of the Site Based Stormwater Quality
Management Plan listed in this Decision Notice
(b) a total tank capacity of 50 000 litres
(c) Deleted.
(d) re-use of harvested rainwater for internal non-potable uses and outdoor uses.
40. Certification must be submitted to Council from a qualified person* which certifies that
the rainwater collection tank and associated reticulation have been installed in
accordance with the requirements of this Decision Notice. *(Refer to Advisory Note)
Easements
41. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property. All easements must be designed in
accordance with the planning scheme and granted at no cost to the Grantee. Where
the Grantee is Council or a service authority, the easement documentation must be in
accordance with the Grantee’s standard easement terms.
Page 23 of 34