ORDINARY MEETING AGENDA 26 JUNE 2014
42. Draft easement documentation must be submitted to Council for endorsement.
43. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
44. All fill and associated batters must be must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
Damage to Services and Assets
45. Any damage caused to existing services and assets above or below the ground must
be repaired:
(a) where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
(b) where otherwise, upon completion of the works associated with the
development.
(c) Any repair work which proposes to alter the alignment or level of existing
services and assets must first be referred to the relevant service authority for
approval.
UNITYWATER
Water and Sewerage
46. The fire-fighting demand on Unitywater’s water supply system from the development
must not exceed 30 litres per second.
47. A single Unitywater installed primary water meter must be provided immediately
inside the property boundary. Additional water meters must be installed for each title
of a community title or sub-lease scheme. Meters must be Unitywater approved,
installed in accordance with Unitywater standards and requirements and remain
accessible at all times for reading and maintenance purposes.
48. Water meters must be located on alternative boundaries to electrical pillars.
49. Buildings and other structures must maintain a minimum clearance of 1.5 metres
from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and
inspection openings.
50. The applicant must adjust the level of the existing sewerage inspection opening as
necessary to suit the proposed finished levels. Work must be undertaken by
Unitywater at the owner’s cost. Where the existing sewerage inspection opening point
is located within a sealed or concreted area, a brass cap is required to be fitted.
51. Storm water retention systems and gross pollutant traps must maintain a minimum
clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure.
52. Redundant sewer pipes within the development site must be removed or slurry filled.
53. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from
Unitywater water mains and 1.5 metres from Unitywater sewerage mains.
Landscaping plants within these clearances must be low growing when mature and
suitable approved varieties.
54. Construction works undertaken in the vicinity of Unitywater water supply or sewerage
infrastructure must not adversely affect the integrity of the infrastructure. All costs
associated with repair, replacement or alteration of infrastructure must be met by the
applicant.
Page 24 of 34
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.