Council archive · source document
20517 App A.pdf [As Published] · 132007.1259
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: ( tick the applicable box/es)
C1 (i) _ tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
CO (ii) tidal work that is prescribed tidal work" other than ina canal'2 -complete Part P of Form 1; or
C1 iii) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) to (i) below are ticked.
C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water) where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing a canal'? intended to be connected to tidal waters;
constructing an artificial waterway;
reclaiming land under tidal water;
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on land, other than State coastal land,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or +)
DX] (iv)_none of the above.
onooo000
Se
. The application involves operational work that is: ( tick the applicable box/es)
(C1 (i) tidal work’ as defined under the Coastal Protection and Management Act 19965 (the
Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
C1 (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; or
C1 (ii) carried out within a coastal management district" under the Coastal Act and for -
O(a)
CI (b)
disposing of dredge spoil or other solid waste material in tidal water - complete Part
MofForm 1;
reclaiming land under tidal water - complete Part M of Form 1; of
constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
. The application involves: (tick the applicable box/es)
DJ (v) none of the above
Oe)
Part M of Form 1;
(iv) none of the above.
(C1 (i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district'S
C1 (i) a material change of use assessable under a planning scheme involving building — )
work, carried out completely or partly in a coastal management district that is —
« the construction of a new premises with a GFA’® of at least 1000m?
« the enlargement of the GFA of existing premises by more than 1000m?
O (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
C (iv) reconfiguring a lot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal’? — complete Part M of Form 1
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canal means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.
16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App A.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.