Skip to the record
The only place to find full transcripts.

Council archive · source document

20517 App A.pdf [As Published] · 132007.1259

of 27

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

INTEGRATED PLANNING ACT 1997 IDAS Assessment Version 20, 2 2007
a =.|12. Does the application involve development below high water mark'8 and within the limits of a port

under the Transport Infrastructure Act 1994?

NO

(YES - complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

13. Does the application involve operational work that is tidal work for a marina’? with more than 6
- vessel berths?
NO

(YES - complete Part M of Form 1, or Part P of Form 1 if the tidal work is prescribed tidal work

14. Does the application involve tidal works within a strategic port land tidal area2°?
XX No

(C1 YES - complete Part M of Form 1

15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
NO :

(C1 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)
Ci () — amaterial change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
O (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
tegistered place under the Queensland Heritage Act 1992;
(ii) none of the above.

16. The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

(i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;

Li (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994,

EXI (ii) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
19 Marina is defined in the Transport Operations (Maritime Pollution) Regulation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
8.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

20517 App A.pdf [As Published].pdf · 8.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.