Council archive · source document
20517 App A.pdf [As Published] · 132007.1259
INTEGRATED PLANNING ACT 1997
12,
13.
14.
15.
16.
17,
18.
19,
IDAS Assessment Version 20, 2 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
LJ no [J YES (ensure you have completed Part Ks of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(J i) assessable works
(J ii) self-assessable works
(J iti) exempt works
Does the application involve works that interfere with overland flow water in a FMA?
O NO oO YES (ensure you have completed Part Kio of Form 1)
\f YES, is the application for works stated in the relevant wild rivers declaration to be?
(Ji) assessable works
O il) self-assessable works
(1 ili) exempt works
Does the application involve building or raising waterway barrier works in a PA?
IN) [11 YES (ensure you have completed Part Os of Form 1)
Does the application involve aquaculture in a PA?
Jno {J YES (ensure you have completed Part O; of Form 1)
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
LJ No LJ Yes (ensure you have completed the relevant Part K of Form 1)
If YES,
(1 i) The application is for an instream dam or weir; or
(J ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App A.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.