Council archive · source document
20517 App A.pdf [As Published] · 132007.1259
INTEGRATED PLANNING ACT 1997 20. 21. 22. 23, 24. IDAS Assessment Version Does the application involve an ERA? LINno LIYES (ensure you have completed Part G of Form1) Is the application for an ERA 20 instream? LINo Clyes ls a quarry allocation notice held for the proposed ERA 20 instream? LINo Les Does the application involve any of the following in a HPA? i) a level 2 ERA 11, (and is for specified works or a-residential complex) ii) an ERA 19 (dredging) 2 2007 iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in the Wild Rivers Act 2005, and Environmental Protection Act 1994) iv) an ERA 22 (out of stream) LJ No (J Yes . Is the proposed development for ERA 20 (out of stream) and; — inaFMA; and — not low impact; and — not for a residential complex in the area, or for specified works. CI No 1 Yes 25. Has documentation been included with the application describing how the applicant proposes to comply with the mandatory requirements, required outcomes, and/ or performance requirement= ) as set out in the relevant part/s of the Wild Rivers Code? NO YES 2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW. Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20517 App A.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 8.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.