Skip to the record
Search everything, all in one place.

Original source · versioned page text

Town Planning Report

of 158
MATERIAL CHANGE OF USE FOR WORKERS ACCOMMODATION
UPON LAND AT 23 BOTTLEBRUSH AVENUE, NOOSA



 PURPOSE & OVERALL OUTCOMES                                            PROPOSAL                                                         COMPLIANCE
 h) Existing vegetation is retained where possible and creates
     shade and cooling on site.
 i) Stormwater is collected and used on site for non-potable
    purposes of gardening, toilet flushing, laundry and hot
    water supply uses.
 j) Healthy indoor environments are provided by incorporating
     the use of low toxic materials, natural light and cross
     ventilation.




4.3.2 Performance Outcomes & Acceptable Outcomes
 PERFORMANCE OUTCOMES                       ACCEPTABLE OUTCOMES                          PROPOSAL                                       COMPLIANCE

 Energy efficiency
 PO1                                        AO1                                          AO1
 Development     minimises  energy          No acceptable outcome provided               The development will minimise energy           ☐Compliant
 consumption and the production of                                                       consumption and greenhouse gas emissions
                                                                                                                                        ☐N/A
 greenhouse gas emissions.                                                               where possible.
                                                                                                                                        ☐Performance Solution

 Water efficiency and stormwater management
 PO2                                  AO2.1                                              AO2.1
 Development         maximises water         If for accommodation activities, a minimum Due to the small site area and slope            ☐Compliant
 efficiency on site by incorporating         3,000 litres of rain water storage is provided constraints, on site water storage is not
 rainwater collection and reuse                                                                                                         ☐N/A
                                             per dwelling and reused for non-potable practicable.
 measures for non-potable purposes                                                                                                      ☒Performance Solution
                                             purposes and incorporated into a
 such as irrigation.
                                             stormwater management plan for the

 Brisbane                      Byron Bay                   Gold Coast
 07 3361 9999                  02 6637 9110                07 5613 2499                                                       Postal: PO Box 7657 EAST BRISBANE QLD 4169
                                                                                                                    E: [email protected] | W: www.tpalliance.com.au
 Level 1, 32 Logan Road        Office 8, 1 Porter Street   Shop 12, 228 Varsity Parade
 WOOLLOONGABBA QLD 4102        BYRON BAY NSW 2481          VARSITY LAKES QLD 4227                                                                               Page 96

Log in to download the original (Town Planning Report.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.