Original source · versioned page text
Town Planning Report
MATERIAL CHANGE OF USE FOR WORKERS ACCOMMODATION UPON LAND AT 23 BOTTLEBRUSH AVENUE, NOOSA PERFORMANCE OUTCOMES ACCEPTABLE OUTCOMES PROPOSAL COMPLIANCE development. AO2.2 AO2.2 ☐Compliant With the exception of accommodation Not applicable. ☒N/A activities, rain water storage sufficient for ☐Performance Solution the intended use is captured and used on-site for non-potable purposes and incorporated into a stormwater management plan for the development. PO3 AO3.1 AO3.1 Development reduces stormwater Development incorporates water sensitive The proposed development incorporates ☒Compliant run-off by minimising impervious areas urban design measures to manage WSUD measures where possible. and maximising site vegetation to ☐N/A stormwater. absorb water on site. ☐Performance Solution AO3.2 PO3 ☐Compliant Development incorporates porous The proposed development incorporates ☐N/A pavements on low trafficked areas such as WSUD measures where possible. ☒Performance Solution footpaths and car parks. PO4 AO4 AO4 ☐Compliant No acceptable outcome provided Development limits changes and Due to the site’s sloping topography, ☐N/A disturbances to the site topography to disturbance to soil is unavoidable. ☒Performance Solution preserve existing drainage channels as much as possible. Landscaping Brisbane Byron Bay Gold Coast 07 3361 9999 02 6637 9110 07 5613 2499 Postal: PO Box 7657 EAST BRISBANE QLD 4169 E: [email protected] | W: www.tpalliance.com.au Level 1, 32 Logan Road Office 8, 1 Porter Street Shop 12, 228 Varsity Parade WOOLLOONGABBA QLD 4102 BYRON BAY NSW 2481 VARSITY LAKES QLD 4227 Page 97
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.