Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Appendix D Stormwater Management Plan · MCU22/0038

of 37

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 19, section 1. The text section number identifies this passage in the reader.

 15 March 2022


4.7.7 Reporting / Review

Records such as licences, approvals, permits and inspection reports must be reviewed on a regular
basis (e.g. at least monthly) to ensure that legal compliance is met, complaints are reviewed and
systems are working to prevent contamination.

4.7.8 Corrective Actions

    •     Perform clean-up of any spills immediately.
    •     Any mud or sediment which is tracked onto public roads is to be immediately removed
          using dry clean-up methods i.e. shovel and broom.
    •     Remove or relocate any stockpiles of waste where there is a reasonable risk of erosion and
          sedimentation.
    •     Replace or repair sediment or pollution control devices if they are not maintained in good
          working condition.




 Excellence with Economy in Engineering                                                                18
 l:\8000-8999\8600-8699\8662\reports\15-03-22 stormwater management plan_issue a.docx

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Stormwater Management Plan.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.