5         CONCLUSION
This Stormwater Management Plan demonstrates that under the proposed concept plan
stormwater quality and quantity treatment is achievable to the levels required by State Planning
Policy July 2017.

The lawful point of discharge for the development site is the existing internal Noosa Civic Shopping
Centre stormwater infrastructure south of the proposed development and the existing drainage
system in Hofmann Drive. The existing Noosa Civic Shopping Centre lawful point of discharge is the
Creek to the South of the site.

Stormwater runoff from the new roof, carpark, and internal road will be directed to 2 bioretention
basins for stormwater quality treatment. High flow bypasses will be constructed around the
bioretention basins for flows exceeding the treatment flows.

The bioretention basins will be located in the south west and along the western boundary of the
site, with treated water discharging from site via the basement pump out system. This is required
due to the high invert levels of the surrounding stormwater network

Stormwater discharged from site is proposed to be consistent with the existing commercial centre
discharge. This development sits within a lot that has been allowed for in previous stormwater
calculations, therefore no detention is proposed for this development.


6         LIMITATIONS OF REPORT
MPN have prepared this report for the proposed Lot 22 Medihub development at Eenie Creek Road
Noosaville in accordance with MPN’s proposal to Stockwell. This report is provided for the exclusive
use of Stockwell for this specific project and its requirements. It should not be used or relied upon by a
third party and MPN accept no responsibility for the use of this report by any party other than
Stockwell.




 Excellence with Economy in Engineering                                                                      19
 l:\8000-8999\8600-8699\8662\reports\15-03-22 stormwater management plan_issue a.docx

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Appendix D Stormwater Management Plan.pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.