GENERAL COMMITTEE MEETING                                                           14 AUGUST 2023


6.1       CONTRACT NO. CN00315 - FLOOD RECONSTRUCTION - PACKAGE 10 -
          STORMWATER INFRASTRUCTURE REPLACEMENTS


Author              Disaster Reconstruction Coordinator, Julie Calvert
                    Infrastructure Services Department
Index               ECM / Subject / Contracting / Road Construction
                    ECM / Projects (T1) / CN00315 Flood Reconstruction - Package 10 -
                    Stormwater Infrastructure Placements
Attachments         None


EXECUTIVE SUMMARY
      •   This report provides a tender evaluation summary and recommendation for the tender award
          for the reconstruction of various stormwater Infrastructure sites which were impacted by the
          February/March 2022 Flood.
      •   In accordance with Council procurement policy and procedure, an Invitation to Tender (ITT)
          was initiated. The ITT identified that an industry briefing was required. This was considered
          a mandatory requirement to properly understand the project and to validate tender
          responses. The industry briefing attracted eight (8) attendees. At the response closing time
          on 29 June 2023, six (6) tender submissions were received, two (2) of which were assessed
          as non-conforming.
      •   The tender evaluation panel completed the evaluation process and considered the tender
          from SGQ Pty Ltd to be the most advantageous to Council, presenting the best value for
          money.
      •   The reconstruction is funded by Queensland Reconstruction Authority (QRA) using funds
          from both state and federal government. The site is an eligible structure under the
          Reconstruction of Essential Public Assets (REPA) and funded under the Disaster
          Reconstruction Funding Arrangements (DRFA) grant.


RECOMMENDATION
That Council note the report by the Disaster Reconstruction Coordinator to the General Committee
Meeting dated 14 August 2023 and:
A. Award Contract No. CN00315 for Flood Reconstruction - Package 10 - Stormwater Infrastructure
   Replacements to SGQ Pty Ltd; and
B. Authorise the CEO to negotiate the final Contract with SGQ Pty Ltd; and
C. Authorise the CEO to amend the contract up to 11.5% of the total contract value.




                                                                                               Page 334 of 476

Log in to download the original (b1337d84ed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.