Skip to the record
NoosaWatch™: The source of truth.

Original source · versioned page text

Meeting papers

of 476
Corporate Plan Theme - The Noosa Community                                                                                                                     Operational Plan 22/23
Corporate Plan Key      Operational Initiatives       Outcomes                        Responsible        Update                                                 Q4 Status
Focus Areas                                                                           Areas
                                                                                                        designs done and currently working through
                                                                                                        development approval process.




                        Noosa Leisure Centre          Optimization of the use of      Community         Community and stakeholder engagement has been           On track
                        Options Study                 the facility and community      Facilities        completed and the component schedule and site           The completion of the
                                                      needs are met                                     analysis work is currently underway.                    needs assessment
                                                                                                                                                                and forward plan for
                                                                                                                                                                the NLC is
                                                                                                                                                                incorporated in the
                                                                                                                                                                23/24 Oper. Plan
                        Wallace House Wood Borer      Preventative maintenance        Property          Discussing scheduling options with resident group.      Completed
                        inspection                    to ensure the structural        Branch
                                                      integrity of the building
                        Repaint Peregian Beach Surf   Preventative maintenance        Property          Painting completed.                                     Completed
                        Clubhouse                     to ensure the whole of life     Branch
                                                      structural integrity and
                                                      amenity of the building
2.5 Plan and build an   All-Abilities Playground      Increased interaction and        Infrastructure   Playground opened in May 2022.                          Completed
iconic all abilities    completed                     inclusiveness making it          Planning
playground at                                         easier for kids of all abilities Design and
Cooroy                                                to take part in fun and          Delivery
                                                      challenging outdoor play         Branch
2.6 Explore options     Pre-Feasibility Study Noosa   Options and scenarios for a Director              Community engagement undertaken and analysis            Completed
for and investigate     Regional Gallery (Stage 2 &   new regional art gallery are Community            complete, Gold Coast & Tweed Gallery site visits
the feasibility of      3)                            analysed to assist Council Services               complete, Councillor workshops held, evaluation
relocating the Noosa                                  in deciding whether to                            criteria for options and potential sites finalised,
Regional Gallery                                      proceed to a further stage                        internal stakeholder consultation complete, site
                                                      in this project                                   evaluation complete and final sites determined for
                                                                                                        business case, preparation work for business case in
                                                                                                        23/24 complete.




                                                                                                                                                                     Page 453 of 476

Log in to download the original (b1337d84ed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.