Corporate Plan Theme - The Noosa Community Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Update Q4 Status
Focus Areas Areas
2.7 Plan for Noosa's Community Support Improved system with Noosa Software is now live and fully operational. The project Completed
aging demographic software upgrade customer privacy controls Community is now complete.
and support our and requirements met Support
health and aged care
sectors
2.8 Maintain the Review of Noosa Local Increased local area Director Noosa LDMG adopted the Noosa LDMP at the Behind Schedule
ability to respond to Disaster Management Plan capability for prevention Infrastructure February 2023 meeting. The new corporate branding The implementation of
disaster events preparedness, response, Services is being applied to the Plan and should be available the DMP has been
(LDMP) and recovery in a disaster at the beginning of August. The Plan will then be incorporated in the
presented for adoption by Council at a future Council 23/24 Oper. Plan
meeting.
Support the community in Increased community Director Community Recovery Officer commenced Nov. Social Completed
the ongoing recovery efforts health and wellbeing Community Worker commenced December at Pomona
from the 2022 Floods Services Community House (funding from PHN). Black
Mountain comms portal launched. Recovery survey
results analysed. Recovery activities underway and
ongoing through 23/24. Extensive work underway in
reconstruction.
Page 454 of 476
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (b1337d84ed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.