Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Meeting papers

of 476
Corporate Plan Theme - The Noosa Community                                                                                                                     Operational Plan 22/23
Corporate Plan Key      Operational Initiatives        Outcomes                     Responsible       Update                                                    Q4 Status
Focus Areas                                                                         Areas


2.7 Plan for Noosa's    Community Support              Improved system with         Noosa            Software is now live and fully operational. The project    Completed
aging demographic       software upgrade               customer privacy controls    Community        is now complete.
and support our                                        and requirements met         Support
health and aged care
sectors
2.8 Maintain the        Review of Noosa Local          Increased local area         Director         Noosa LDMG adopted the Noosa LDMP at the                   Behind Schedule
ability to respond to   Disaster Management Plan       capability for prevention    Infrastructure   February 2023 meeting. The new corporate branding          The implementation of
disaster events                                        preparedness, response,      Services         is being applied to the Plan and should be available       the DMP has been
(LDMP)                                                 and recovery in a disaster                    at the beginning of August. The Plan will then be          incorporated in the
                                                                                                     presented for adoption by Council at a future Council      23/24 Oper. Plan
                                                                                                     meeting.


                        Support the community in       Increased community          Director         Community Recovery Officer commenced Nov. Social Completed
                        the ongoing recovery efforts   health and wellbeing         Community        Worker commenced December at Pomona
                        from the 2022 Floods                                        Services         Community House (funding from PHN). Black
                                                                                                     Mountain comms portal launched. Recovery survey
                                                                                                     results analysed. Recovery activities underway and
                                                                                                     ongoing through 23/24. Extensive work underway in
                                                                                                     reconstruction.




                                                                                                                                                                     Page 454 of 476

Log in to download the original (b1337d84ed.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.