Corporate Plan Theme - Long Term Planning for Noosa Shire Operational Plan 22/23
Corporate Plan Key Operational Initiatives Outcomes Responsible Update Q4 Status
Focus Areas Areas
23/24 Oper. Plan
E mobility trial Understand the physical and Infrastructure Monitoring Beam rollout from private land. Code of Completed
regulatory requirements and Planning, Conduct distributed to operators. There is no
issues associated with the Design & proposal to run a PMD trial on public land at this
use of e-mobility devices Delivery stage.
across the shire
4.3 Implement the Undertake non powered Delivery of land use Community Feasibility work is now complete post final Completed
Noosaville Foreshore water sports feasibility outcomes identified in the Facilities stakeholder consultation on draft iterations. Is now
Land Use study Noosa Foreshore Land Use sitting with consultant to finalize report for
Management Plan Master Plan presentation to council in the near future.
4.4 Ensure effective Develop the new Noosa Council's long-term vision CEO Draft Corporate Plan consultation has been Completed
service planning Council Corporate Plan and strategic direction completed and the plan has been finalised for
processes are in place established and incorporated adoption by the Council at a Special Meeting in April.
into the new Corporate Plan
Corporate review Increased organisational CEO Organisational realignment has been adopted by Completed
efficiencies and Council and is being implemented as per the
organisational capability resolution.
Progress the Optimisation of landfill, Waste Fill plans complete and under Council review. On track
implementation of the control leachate and Services Tracking sheet draft complete. Expansion of the The development of
Noosaville, Eumundi Road emissions capture masterplan to include the works listed here but now the Noosa Landfill and
Landfill Master Plan considering infrastructure to divert waste. Project Resource Recovery
initiation document (PID) submitted for ongoing Facility Master Plan is
development of masterplan including project specific incorporated in the
PID’s against technology for diversion 23/24 Oper. Plan
Page 461 of 476
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (b1337d84ed.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.