g. A minimum Finished Floor Level (FFL) of the Aged Care Facility and any
associated facilities at 8.80m AHD.
h. A minimum Finished Floor Level (FFL) of the Independent Living Units of 8.80m
AHD.
i. All relevant Noosa Council Planning Scheme Policies, standard drawings,
standard specifications and guidelines are to be adhered to.
Prior to the issue of a Development Permit for Material Change of Use these reports
must be amended to reflect the amended development proposal as required by
Condition 2.
Drainage Easement
27. An easement for drainage purposes must be registered against the titles of the
properties in favour of council over the land area identified as being below the post
development 1% AEP flood level on the subject site from flooding sources external to
the site (excluding proposed structures). The easement width must be in accordance
with Noosa Council’s DDPSP. The easement must be granted at no cost to Noosa
Council. The wording of the easement documentation must be in accordance with
Council’s Standard Easement document.
28. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
Acid Sulfate Soils
29. As the site is located below the 20m AHD and above the 5m AHD, any excavation
works consisting of 100m3 or greater which extends below 5m AHD will need to be
carried out in accordance with the State Planning Policy and the Noosa Plan. In this
regard appropriate testing and supporting documentation prepared by a suitably
qualified specialist must be submitted to Council for approval prior to obtaining a
Development Permit for Operational Works.
Erosion and Sediment Control
30. Any person acting on this permit must prevent erosion and sediment export from
leaving the site. Site control measures such as silt fencing, controlled gravel access
to the site and controlled disposal of waste, will be necessary.
In this regard plans detailing the methods of controlling erosion and sediment are
required to be submitted to the Council for approval prior to obtaining a Development
Permit for Operational Works.
LANDSCAPE & ECOLOGY
Landscaping & Vegetation Clearing
31. The development site must be landscaped. The works must be undertaken in
accordance with an Operational Works approval and the Noosa Plan for that specific
area and must include in particular:
a. Provide landscaping plans that provide detailed sections and plan of a 6.0
metre landscaped buffer adjacent to the northern boundary to buffer the
adjacent residential uses from the development.
b. Provide detail of the number of mature native trees (>150mm DBH) including
species and canopy spread, proposed to be removed to facilitate all aspects of
the development proposal.
Page 14 of 74
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.