PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA                                 7 AUGUST 2018


    19.   Digital detailed designs including drawings, calculations, specifications and a
          schedule of works, must be submitted with any application for a Development Permit
          for Operational Works in respect of roadworks and stormwater drainage works. The
          design must be in accordance with Council’s Planning Scheme Policy PSP05 –
          Engineering Design Standards – Roads, Drainage and Earthworks. To avoid conflict
          with underground pipes or services, all existing and proposed services required by
          the development must be shown on the plans.
    20.   To facilitate production of As Constructed drawings it is suggested that all design
          drawings are submitted in the Asset Design and As Constructed (ADAC) digital
          format. (Guidelines on the use of ADAC are available at www.adac.com.au).
    21.   A construction management plan/strategy to ensure no damage occurs to Council
          services must be prepared by a suitably qualified Registered Professional Engineer
          and submitted to Council in conjunction with any application for Operational Works.
    22.   Any damage caused to any public utility during the course of construction must be
          repaired to Council’s standards and at no cost to Council.
    23.   Any alteration of any public utility or other facilities necessitated by the development
          of the land or associated construction works external to the site must be at no cost to
          Council.
    24.   The transportation of all materials to and from the site must be undertaken in a
          manner such that no particle matter escapes onto a public road. All vehicles carrying
          materials either to or from the site must be covered to prevent materials including
          dust being windblown from the vehicle.
    25.   As Constructed drawings and data must be certified by a qualified experienced Civil
          Engineer for design intent, and a Licensed Surveyor must certify the cadastre and the
          location, level and type of all services and structures. All of which must be submitted
          to Council for checking and for Council’s records.
          The data must fully detail levels for all engineering works including but not limited to
          drainage structures, finished ground levels and pavement surface levels. The data
          must be submitted in the Asset Design and As Constructed (ADAC) digital format.
          (Guidelines on the use of ADAC are available at www.adac.com.au).
          Approval of works must not be granted until all As Constructed information has been
          supplied and accepted by Council.
          Stormwater
    26.   All works must be constructed and work procedures undertaken in accordance with:
          a.    The approved plans, the approved amended plans and the conditions detailed
                in this Decision Notice.
          b.    The document ‘Proposed Cartwright Village Extension – Carramar, Noosa Care
                Integrated Water Management Plan Version 0’ by Callaghan & Toth dated 12
                February 2018
          c.    The document ‘Noosa Care Inc Cartwright Village Extension Carramar, Cooroy
                Noosa Road, Tewantin Preliminary Design of Stormwater Detention Volume’ by
                BSM dated 21 December 2017
          d.    The document ‘Flood Study Noosa Care – Carramar’ by Cardno dated 24 July
                2017
          e.    The Addendum Letter by Cardno (document number WE17064) dated 23
                March 2018
          f.    The Technical Memorandum by Cardno (ref WE17064_Carramar_TM01) dated
                13 July 2018

                                                                                   Page 13 of 74
Log in to download the original file

2018-08-07 Planning & Environment Committee Agenda(PDF, 7MB).pdf · 7.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.