G.J - Final Plans

Attached to the e-mail Operational Works Application OPW19/0133 - DA Form 1 - Pre-lim Construction Management Plan - Civil Plans - 10 Opal St Cooroy.

of 15

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
 

WORK HEALTH

1. FALLS, SLIPS, TRIPS

a) WORKING AT HEIGHTS

DURING CONSTRUCTION

WHEREVER POSSIBLE, COMPONENTS FOR THIS BUILDING
SHOULD BE PREFABRICATED OFF-SITE OR ATGROUND
LEVEL TO MINIMISE THE RISK OF WORKERS FALLING
MORE THAN TWO METRES. HOWEVER, CONSTRUCTION
OF THIS BUILDING WILL REQUIRE WORKERS TO BE
WORKING AT HEIGHTS WHERE A FALL IN EXCESS OF TWO
METRES IS POSSIBLE AND INJURY IS LIKELY TO RESULT
FROM SUCH A FALL. THE BUILDER SHOULD PROVIDE A
SUITABLE BARRIER WHEREVER A PERSON IS REQUIRED TO
WORK IN A SITUATION WHERE FALLING MORE THAN TWO.
METRES IS A POSSIBILITY.

DURING OPERATION OR MAINTENANCE

CLEANING AND MAINTENANCE OF WINDOWS, WALLS,
ROOF OR OTHER COMPONENTS OF THIS BUILDING WILL
REQUIRE PERSONS TO BE SITUATED WHERE A FALL FROM
A HEIGHT IN EXCESS OF TWO METRES IS POSSIBLE. WHERE
THIS TYPE OF ACTIVITY tS REQUIRED, SCAFFOLDING,
LADDERS OR TRESTLES SHOULD BE USED IN
ACCORDANCE WITH RELEVANT CODES OF PRACTICE,
REGULATIONS OR LEGISLATION.

b) SLIPPERY OR UNEVEN SURFACES

FLOOR FINISHES

THE OWNER IS RESPONSIBLE FOR THE SELECTION OF
SURFACE FINISHES IN THE PEDESTRIAN TRAFFICABLE
AREAS OF THIS BUILDING. SURFACES SHOULD BE
SELECTED IN ACCORDANCE WITH AS HB 197:1999 AND
AS/NZ 4586:2004,

STEPS, LOOSE OBJECTS AND UNEVEN

SURFACES

CONTRACTORS SHOULD BE REQUIRED TO MAINTAIN A
TIDY WORK SITE DURING CONSTRUCTION,
MAINTENANCE OR DEMOLITION TO REDUCE THE RISK OF
TRIPS AND FALLS IN THE WORKPLACE. MATERIALS FOR
CONSTRUCTION OR MAINTENANCE SHOULD BE STORED
IN DESIGNATED AREAS AWAY FROM ACCESS WAYS AND
WORK AREAS.

2. FALLING OBJECTS

LOOSE MATERIALS OR SMALL OBJECTS

CONSTRUCTION, MAINTENANCE OR DEMOLITION WORK
ON OR AROUND THIS BUILDING IS LIKELY TO INVOLVE
PERSONS WORKING ABOVE GROUND LEVEL OR ABOVE
FLOOR LEVELS, WHERE THIS OCCURS ONE OR MORE OF
THE FOLLOWING MEASURES SHOULD BE TAKEN TO.
AVOID OBJECTS FALLING FROM THE AREA WHERE THE
WORK IS BEING CARRIED OUT ONTO

AND SAFETY REPORT NOTES (MANAGING RISKS IN CONSTRUCTION}

2. FALLING OBJECTS (cont.)

PERSONS BELOW.

|, PREVENT OR RESTRICT ACCESS TO AREAS BELOW
WHERE THE WORK IS BEING CARRIED OUT.

2, PROVIDE TOE BOARDS TO SCAFFOLDING OR WORK
PLATFORMS.

3. PROVIDE PROTECTIVE STRUCTURE BELOW THE WORK
AREA,

4, ENSURE THAT ALL PERSONS BELOW THE WORK AREA
HAVE PERSONAL PROTECTIVE EQUIPMENT.

BUILDING COMPONENTS

DURING CONSTRUCTION, RENOVATION OR DEMOLITION
OF THIS BUILDING, PARTS OF THE STRUCTURE INCLUDING
FABRICATED STEELWORK, HEAVY PANELS AND MANY
OTHER COMPONENTS WILL REMAIN STANDING PRIOR TO
OR AFTER SUPPORTING PARTS ARE IN PLACE.
CONTRACTORS SHOULD ENSURE THAT TEMPORARY
BRACING OR OTHER REQUIRED SUPPORT IS IN PLACE AT
ALL TIMES WHEN COLLAPSE WHICH MAY INJURE
PERSONS IN THE AREA tS A POSSIBILITY.

MECHANICAL LIFTING OF MATERIALS AND.
COMPONENTS DURING CONSTRUCTION, MAINTENANCE
OR DEMOLITION PRESENTS A RISK OF FALLING OBJECTS.
CONTRACTORS SHOULD ENSURE THAT APPROPRIATE
LIFTING DEVICES ARE USED, THAT LOADS ARE PROPERLY
SECURED AND THAT ACCESS TO AREAS BELOW THE LOAD
tS PREVENTED OR RESTRICTED.

3. TRAFFIC MANAGMENT

BUSY CONSTRUCTION AND DEMOLITION SITES PRESENT A
RISK OF COLLISION WHERE DELIVERIES AND OTHER
TRAFFIC ARE MOVING WITHIN THE SITE. A TRAFFIC
MANAGEMENT PLAN SUPERVISED BY TRAINED TRAFFIC
MANAGEMENT PERSONNEL SHOULD BE ADOPTED FOR
THE WORK SITE.

4. SERVICES

RUPTURE OF SERVICES DURING EXCAVATION OR OTHER
ACTIVITY CREATES A VARIETY OF RISKS INCLUDING
RELEASE OF HAZARDOUS MATERIAL. EXISTING SERVICES
ARE LOCATED ON OR AROUND THIS SITE. WHERE
KNOWN, THESE ARE IDENTIFIED ON THE PLANS BUT THE
EXACT LOCATION AND EXTENT OF SERVICES MAY VARY
FROM THAT INDICATED. SERVICES

4, SERVICES (cont.)

SHOULD BE LOCATED USING AN APPROPRIATE SERVICE
(SUCH AS DIAL BEFORE YOU DIG), APPROPRIATE
EXCAVATION PRACTICE SHOULD BE USED AND, WHERE
NECESSARY, SPECIALIST CONTRACTORS SHOULD BE
USED.

OVERHEAD POWER LINES ARE NEAR OR ON THIS SITE.
THESE POSE A RISK OF ELECTROCUTION IF STRUCK OR
APPROACHED BY LIFTING DEVICES OR OTHER PLANT
AND PERSONS WORKING ABOVE GROUND LEVEL.
WHERE THERE IS A DANGER OF THIS OCCURRING,
POWER LINES SHOULD BE, WHERE PRACTICAL,
DISCONNECTED OR RELOCATED. WHERE THIS IS NOT
PRACTICAL ADEQUATE WARNING IN THE FORM OF
BRIGHT COLOURED TAPE OR SIGNAGE SHOULD BE USED
OR A PROTECTIVE BARRIER PROVIDED.

5. MANUAL TASKS

COMPONENTS WITHIN THIS DESIGN WITH A MASS IN
EXCESS OF 25KG SHOULD BE LIFTED BY TWO OR MORE
WORKERS OR BY MECHANICAL LIFTING DEVICE. WHERE
THIS IS NOT PRACTICAL, SUPPLIERS OR FABRICATORS
SHOULD BE REQUIRED TO LIMIT THE COMPONENT MASS.

ALL MATERIAL PACKAGING, BUILDING AND
MAINTENANCE COMPONENTS SHOULD CLEARLY SHOW
THE TOTAL MASS OF PACKAGES AND WHERE PRACTICAL
ALL ITEMS SHOULD 8E STORED ON SITE IN A WAY WHICH
MINIMISES BENDING BEFORE LIFTING.ADVICE SHOULD
BE PROVIDED ON SAFE LIFTING METHODS IN ALL AREAS
WHERE LIFTING MAY OCCUR. CONSTRUCTION,
MAINTENANCE AND DEMOLITION OF THIS BUILDING WILL
REQUIRE THE USE OF PORTABLE TOOLS AND EQUIPMENT.
THESE SHOULD BE FULLY MAINTAINED IN ACCORDANCE
WITH MANUFACTURER'S SPECIFICATIONS AND NOT USED
WHERE FAULTY OR (IN THE CASE OF ELECTRICAL
EQUIPMENT} NOT CARRYING A CURRENT ELECTRICAL
SAFETY TAG. ALL SAFETY GUARDS OR DEVICES SHOULD
BE REGULARLY CHECKED AND PERSONAL PROTECTIVE
EQUIPMENT SHOULD BE USED IN ACCORDANCE WITH
MANUFACTURER'S SPECIFICATION.

6. HAZARDOUS SUBSTANCES

POWDERED MATERIALS

MANY MATERIALS USED IN THE CONSTRUCTION OF THIS
BUILDING CAN CAUSE HARM IF INHALED IN POWDERED.
FORM. PERSONS WORKING ON OR IN THE BUILDING
DURING CONSTRUCTION, OPERATIONAL MAINTENANCE
OR DEMOLITION SHOULD ENSURE GOOD VENTILATION
AND WEAR PERSONAL PROTECTIVE EQUIPMENT
INCLUDING PROTECTION

6. HAZ, SUBSTANCES (cont.)

AGAINST INHALATION WHILE USING POWDERED
MATERIAL OR WHEN SANDING, DRILLING, CUTTING OR
OTHERWISE DISTURBING OR CREATING POWDERED
MATERIAL.

TREATED TIMBER

THE DESIGN OF THIS BUILDING INCLUDES PROVISION
FOR THE INCLUSION OF TREATED TIMBER WITHIN THE
STRUCTURE. DUST OR FUMES FROM THIS MATERIAL CAN
BE HARMFUL, PERSONS WORKING ON OR IN THE
BUILDING DURING CONSTRUCTION, OPERATIONAL
MAINTENANCE OR DEMOLITION SHOULD ENSURE GOOD
VENTILATION AND WEAR PERSONAL PROTECTIVE
EQUIPMENT INCLUDING PROTECTION AGAINST
INHALATION OF HARMFUL MATERIAL WHEN SANDING,
DRILLING, CUTTING OR USING TREATED TIMBER IN ANY
WAY THAT MAY CAUSE HARMFUL MATERIAL TO BE
RELEASED. DO NOT BURN TREATED TIMBER,

VOLATILE ORGANIC COMPOUNDS

MANY TYPES OF GLUE, SOLVENTS, SPRAY PACKS, PAINTS,
VARNISHES AND SOME CLEANING MATERIALS AND
DISINFECTANTS HAVE DANGEROUS EMISSIONS. AREAS
WHERE THESE ARE USED SHOULD BE KEPT WELL
VENTILATED WHILE THE MATERIAL IS BEING USED AND
FOR A PERIOD AFTER INSTALLATION, PERSONAL
PROTECTIVE EQUIPMENT MAY ALSO BE REQUIRED. THE
MANUFACTURER'S RECOMMENDATIONS FOR USE MUST
BE CAREFULLY CONSIDERED AT ALL TIMES.

SYNTHETIC MINERAL FIBRE

FIBREGLASS, ROCKWOOL, CERAMIC AND OTHER
MATERIAL USED FOR THERMAL OR SOUND INSULATION
MAY CONTAIN SYNTHETIC MINERAL FIBRE WHICH MAY BE
HARMFUL IF INHALED OR IF IT COMES IN CONTACT WITH
THE SKIN, EYES OR OTHER SENSITIVE PARTS OR THE BODY.
PERSONAL PROTECTIVE EQUIPMENT INCLUDING
PROTECTION AGAINST INHALATION OF HARMFUL
MATERIAL SHOULD BE USED WHEN INSTALLING,
REMOVING OR WORKING NEAR BULK INSULATION
MATERIAL,

TIMBER FLOORS

THIS BUILDING MAY CONTAIN TIMBER FLOORS WHICH
HAVE AN APPLIED FINISH. AREAS WHERE FINISHES ARE
APPLIED SHOULD BE KEPT WELL VENTILATED DURING
SANDING AND APPLICATION AND FOR A PERIOD AFTER
INSTALLATION, PERSONAL PROTECTIVE EQUIPMENT MAY
ALSO BE REQUIRED. THE MANUFACTURER'S
RECOMMENDATIONS FOR USE MUST BE CAREFULLY
CONSIDERED AT ALL TIMES.

7. CONFINED SPACES (cont.)

EXCAVATION AND INSTALLATION OF ITEMS WITHIN
EXCAVATIONS. WHERE PRACTICAL, INSTALLATION
SHOULD BE CARRIED OUT USING METHODS WHICH DO
NOT REQUIRE WORKERS TO ENTER THE EXCAVATION,
WHERE THIS IS NOT PRACTICAL, ADEQUATE SUPPORT FOR
THE EXCAVATED AREA SHOULD BE PROVIDED TO
PREVENT COLLAPSE. WARNING SIGNS AND BARRIERS TO
PREVENT ACCIDENTAL OR UNAUTHORISED ACCESS TO
ALL EXCAVATIONS SHOULD BE PROVIDED.

8. PUBLIC ACCESS

PUBLIC ACCESS TO CONSTRUCTION AND DEMOLITION
SITES AND TO AREAS UNDER MAINTENANCE CAUSES RISK
TO WORKERS AND PUBLIC. WARNING SIGNS AND
SECURE BARRIERS TO UNAUTHORISED ACCESS SHOULD
BE PROVIDED, WHERE ELECTRICAL INSTALLATIONS,
EXCAVATIONS, PLANT OR LOOSE MATERIALS ARE
PRESENT THEY SHOULD BE SECURED WHEN NOT FULLY
SUPERVISED.

9. OPERATIONAL USE OF BUILDING

THIS BUILDING HAS BEEN DESIGNED AS A RESIDENTIAL
BUILDING. IF IT, AT A LATER DATE, 1S USED OR INTENDED.
TO BE USED AS A WORKPLACE, THE PROVISIONS OF THE
WORK HEALTH AND SAFETY ACT 2011 OR SUBSEQUENT
REPLACEMENT ACT SHOULD BE APPLIED TO THE NEW
USE.

10. OTHER HIGH RISK ACTIVITY

ALL ELECTRICAL WORK SHOULD BE CARRIED OUTIN
ACCORDANCE WITH CODE OF PRACTICE: MANAGING
ELECTRICAL RISKS AT THE WORKPLACE, AS/NZ 3012 AND
ALL LICENSING REQUIREMENTS.

ALL WORK USING PLANT SHOULD BE CARRIED OUT IN
ACCORDANCE WITH CODE OF PRACTICE: MANAGING
RISKS OF PLANT AT THE WORKPLACE.

ALL WORK SHOULD BE CARRIED OUT IN ACCORDANCE
WITH CODE OF PRACTICE: MANAGING NOISE AND.
PREVENTING HEARING LOSS AT WORK.

DUE TO THE HISTORY OF SERIOUS INCIDENTS IT IS
RECOMMENDED THAT PARTICULAR CARE BE EXERCISED
WHEN UNDERTAKING WORK INVOLVING STEEL
CONSTRUCTION AND CONCRETE PLACEMENT. ALL THE
ABOVE APPLIES.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

THESE DRAWINGS AND DESIGN ARE ISSUE JDaTe —[ORW/CHKO] COMMENTS
. ___| PROJECT JOB SPECIFICATION BY BUILDER TAKES | DATE
©) GRREPRODUCED BY ANY MEANS [2 [2nomme| ac | ew [prawavare Pans PROPOSED RESIDENCE PRECEDENCE OVER THESE PLANS WH&S NOTES
el WHOLLY PARTLY WITHOUT PRIOR A | 22/10/2018) AK | RW | RELOCATED, WIDTH REDUCED, EAVES ADDED. 7 ——
GJ. Gardner. _HOMES WY D waien PERMISSION FROM. 8 |asmioroa| aK | RW | GENERAL AMENOMENIS hd CHENT SALES CHRIS MeNEIL PROIFCTSIAIUS
: GJ GARDNER HOMES = hamutac tan camaro sj WY, CONSTRUCTION DRAWINGS
Sunshine Coast North | p90 Not scate FROM THIS DRAWING| © fare] nf DEAF CONSLCTON Da CLIENT LOCATION wr Ge | |
2/171 Noosa Eumundi Rd PH: 07 54 702324 VERIFY ALL DIMENSIONS PRIOR TO & [17/01/2019| aK | RW [AMENDED CONSTRUCTION DRAWINGS ERHARTER, Robert LOT 6 ON RP82318 INDICATE
Noosaville , Qld. COMMENCEMENT OF ANY SITE WORKS ] 10 OPAL LANE DRAWING FILE NUMBER | PAGE
AND REFER ANY DISCREPANCIES TO —— GJGSCN190173 12
BESPOKE BUILDING DESIGN COOROY, QLD

 

 

 

 

 

 

 

 

 
Log in to download the original file

G.J - Final Plans.pdf · 2.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.