Original source · versioned page text
2014-01-13 Item 6.3 Appendices 1-5
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Inventory which relates to specific plant and machinery, infrastructure or Based on the allocation of inventory as at 30 June 2013, adjusted for movements
work in progress should go to the new council or continuing council where related to the new council and continuing council operations to 31 December 2013.
the specific plant and machinery, infrastructure or work in progress is
Inventory which relates to specific plant and machinery, infrastructure or work in
allocated.
Inventory progress should go to the new council or continuing council where the specific plant
Residual inventory should be based on the percentage of inventory and machinery, infrastructure or work in progress is allocated.
contributed by the new council and continuing council at amalgamation.
Residual inventory should be based on the percentage of inventory contributed by
the new council and continuing council at amalgamation.
Based on balance of prepayments as at 30 June 2013 attributable to the Based on the balance of prepayments as at 31 December 2013 for the new council
new council and continuing council (ie, allocated in accordance with the and continuing council.
Prepayments underlying transaction).
Based on the physical location of the PP&E as at 30 June 2013. The new Based on the physical location of PP&E assumed as at 30 June 2013, adjusted for
council and continuing council should receive PP&E in their geographical any agreed movements in PP&E to 31 December 2013.
PP&E areas.
The new council and continuing council should receive all PP&E required in their
Where there is uncertainty / disagreement, the allocation should be based on geographical area.
the balance of PP&E held as at 30 June 2012.
Based on the physical location of the assets to which the intangible asset Based on the balance of intangible assets as at 30 June 2013, adjusted for any
Intangible assets relates as at 30 June 2013. movements in intangible assets to 31 December 2013.
Based on the physical location of the capital works in progress as at 30 June Based on the balance of capital works in progress as at 30 June 2013, adjusted for
2013. The new council and continuing council should receive all capital any movements in capital works in progress to 31 December 2013.
Capital works in
works in progress in their geographical area.
progress The new council and continuing council should receive all capital works in progress in
their geographical area.
Based on the actual contribution to trade and other payables by the new Based on the balance of trade and other payables as at 31 December 2013 for the
council and continuing council as at 30 June 2013 (ie, allocated in new council and continuing council.
Trade and other
accordance with the underlying transaction).
payables
24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.