2014-01-13 Item 6.3 Appendices 1-5
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
Appendix 1—Balance sheet allocation methodology
The following table sets out the proposed balance sheet allocation methodology, prepared by QTC, that may be used to determine the separation of balance sheet items between
the continuing and new councils based on the 1 July 2012 opening balance position prepared by QTC and published with the Queensland Boundaries Commissioner’s Report.
The sum of the balance sheets for the new council and continuing council must equal the balance sheet used for statutory reporting purposes by the existing council as at
30 June 2013 and 31 December 2013.
Item As at 30 June 2013 As at 31 December 2013
Council to use the opening balance sheet identified as at 1 July 2012 and Council to use the opening balance sheet identified as at 30 June 2013 and
reconstruct the cash flows that would have occurred for the new council and reconstruct the cash flows that would have occurred for the new council and the
Cash and cash the continuing council over the period from 1 July 2012 to 30 June 2013. continuing council over the period from 31 December 2013.
equivalents The cash flow reconstruction should take into account movements in all cash The cash flow reconstruction should take into account movements in all cash flow
flow items including but not limited to accounts receivable/payable, grants, items including accounts receivable/payable, grants, debt draw downs, repayments
debt draw downs, repayments and interest payments. and interest payments.
Based on the opening balance of debt for the new council and the continuing Based on the opening balance of debt for the new council and continuing council as
council as at 30 June 2012, at 30 June 2013,
- plus new borrowings in proportion to the value of capital expenditure - plus new borrowings made by the existing council on behalf of the new council
made by the existing council in the new council and continuing council and continuing council
Debt geographical area (unless more accurate detail known)
- less redemptions made by the existing council on behalf of the new council and
- less redemptions made by the existing council in proportion to the value continuing council
of borrowings held by the new council and continuing council (unless over the period from 30 June 2013 to 31 December 2013.
more accurate detail known)
over the period from amalgamation on 1 July 2012 to 30 June 2013.
Based on the actual contribution to receivables by the new council and Based on the balance of receivables as at 31 December 2013 for the new council
Receivables continuing council as at 30 June 2013 (ie, allocated in accordance with the and continuing council.
underlying transaction).
Based on where the land is located as at 30 June 2013. The new council Based on the location of the land or other assets assumed as at 30 June 2013,
Land held for and continuing council should receive land held for development in their adjusted for any agreed movements in land or other assets to 31 December 2013.
development geographical areas.
23
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.