Original source · versioned page text
Attachment E - Cardno Statement - flood
Attached to the e-mail MCU18/0009 - Representations to conditions of approval.
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
CARRAMAR NOOSA CARE FIA ADDENDUM 186 Cooroy Noosa Road Tewantin Qld 4565 Figure 5 Northern Section of Fence Line Does the new fencing need to be designed to collapse during flood events; Based on the results obtained in the FIA, those sections of fence that are impacted by flood waters will not need to be designed to collapse. The affected sections of fence line are located in floodwater that is slow moving (< 0.2 m/s) and less than 1 m deep. They are also aligned with the direction of flow. It should be noted that the fence line is located adjacent to dense bush land and downstream of a culvert crossing, both of which will capture large debris before it can impact the fence. Any overland flow from the development is expected to pass through the fence with minimal obstruction. This will be confirmed at the detailed design stage. New development areas within or adjacent to the flood extents There are no new development areas apart from the addition of the fence as outlined above. Runoff from the proposed development. Runoff from the new layout will be less than previously as two villas have been removed, decreasing the impervious area. WE17064 Cardno 27 September 2018 Prepared for Noosa Care Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.