Original source · versioned page text
2021-10-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 OCTOBER 2021
Sheet 02, Elevations, Section & External Finishes Schedule, October 2020
Issue D prepared by Innovate Architects
Sheet 07 Perspectives, prepared by Innovate Architects October 2020
Issue C
Approved Plans – March 2020 Unit 19
Plan No. Rev. Plan, prepared
by
A01 Site Location, Site Plan & Calculations, prepared by Lisa 22 January 2021
Page
A02 Ground Floor Plan – with proposed alterations, prepared by 22 January 2021
Lisa Page
A03 Level 1 Floor Plan, prepared by Lisa Page 22 January 2021
A04 Level 2 Floor Plan, prepared by Lisa Page 22 January 2021
A05 Level 3/Terrace, prepared by Lisa Page 22 January 2021
A06 Elevations Views: North & South facing, prepared by Lisa 22 January 2021
Page (as annotated by Council)
A07 Elevations Views: East & West facing, prepared by Lisa 22 January 2021
Page (as annotated by Council)
A08 Perspective view, Terrace level, prepared by Lisa Page 22 January 2021
A09 Perspective views: south, west, north facing, prepared by 22 January 2021
Lisa Page
A10 Perspective views: south/east/north views, prepared by 22 January 2021
Lisa Page
A11 Section view-east facing, prepared by Lisa Page 22 January 2021
A12 External Material Finishes Palette by Lisa Page 22 January 2021
- Landscape Concept Design document including site plan -
and perspective, cross sections, look and feel and design,
prepared by Louise Custance
Approved Plans – 21 October 2021 Units 9-10 (Lot 30 SP307674)
Plan No. Rev. Plan, prepared by
SD.102 Proposed Holyman Unit 3D perspectives, prepared by N/D
Iss P2 Gerard Smith Design
SD.104 Site / Roof Plan, prepared by Gerard Smith Design Aug 2018
Iss P10
SD.201 Floor Plans, prepared by Gerard Smith Design Aug 2018
Iss P9
SD.501 Elevations proposed, prepared by Gerard Smith Design Aug 2018
Iss P9
SD.601 Cross Sections – Sheet 2, prepared by Gerard Smith Aug 2018
Iss P2 Design
SD.951 Overviewing Diagrams – Level 1, prepared by Gerard Aug 2018
Iss P9 Smith Design
SD.952 Overviewing Diagrams – Level 2, prepared by Gerard Aug 2018
Iss P9 Smith Design
C. Include the following additional conditions 37 - 44 to read as follows:
Additional Conditions specific for Lot 30 (and the use of Lots 7 & 11 for
Page 18 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.