Original source · versioned page text
2021-10-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 OCTOBER 2021
construction and access) – 21 October 2021
Performance Bond - Planning
37. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, specifically for Lot 30, prior to the issue of a Development Permit for
Building Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Performance Bond – Demolition
38. Security to the value of $10,000 must be provided to Council’s Building and
Plumbing Services prior to the issue of the development approval for building works
(demolition). The security must be in the form of a cash bond or bank guarantee,
for security against satisfactory completion of works.
Landscaping
39. The development site must be landscaped generally in accordance with the
approved plans and Planning Scheme Policy PSP2 – Landscaping, and the
following requirements:
a. A minimum of a 1m wide garden with dense landscaping must be provided
to the north, south and western boundaries within Lot 30.
b. The 1m wide garden must consist of 45 litre pot size native trees planted at
1.5m centres. Include 1 x 100 litre pot size tree to be planted in each of the
following locations:
i. south east corner; and
ii. half way along the southern boundary; and
iii. to the west of the visitor car space where the lot dog legs.
c. The plantings must grow to an average minimum height of 10m and be
suitable native species for the urban surroundings such as Syzygium,
Elaeocarpus, Acronychia.
d. All landscape works must be established and maintained in accordance with
the approved design for the life of the development, and in a manner that
ensures healthy, sustained and vigorous plant growth. All plant material
must be allowed to grow to full form and be refurbished when its life
expectancy is reached.
e. Landscape works must be completed prior to the commencement of the use
of Lot 30.
40. The Fig tree, Umbrella, Exotic and Palm trees as shown on Plan No. 18-4767AA
prepared by Max Watterson & Associates may be removed within the lot as part of
preparing the site for construction.
41. Any vegetation to be retained must be protected from clearing or construction
activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared; and
d. using low impact construction techniques around vegetation.
Page 19 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.