Original source · versioned page text
2021-10-21 Ordinary Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
ORDINARY MEETING AGENDA 21 OCTOBER 2021
Water & Sewer Connections
12. An underground connection to reticulated water and sewerage must be provided to the
development site in accordance with the standards and requirements of Northern SEQ
Distributor–Retailer Authority (Unitywater).
13. A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority
(Unitywater) must be submitted to Council that certifies an underground connection to
reticulated water and sewerage has been provided to the development site.
Fencing and Walls
14. Street fencing must be provided generally as shown on the approved plans.
15. The area of land between the street fence and the front property boundary must be
densely landscaped to screen any fencing from the street. A mix of understorey and taller
species must be included.
Clothes Drying Areas
16. Each dwelling unit must be provided with access to an outdoor clothes line which is
screened from public view.
Community Management Statement
17. Any proposed Community Management Statement required for the development
pursuant to the Body Corporate and Community Management Act 1997 must be
submitted to Council for endorsement at the same time as submission of the Building
Format Plan (or similar) to Council for compliance assessment.
Landscaping
18. The site must be landscape in accordance with Planning Scheme Policy PSP2 –
Landscaping. The works must be undertaken in accordance with an operational works
approval and the approved plans and must include in particular:
a. Dense screening vegetation within the gardens located to the perimeter of the site
along the north, south and western boundaries and;
i. must be a minimum of 1m wide unless otherwise shown on the approved
plans;
ii. Trees that grow to a minimum height of 8m planted at 1.5m centres. The
trees must have a minimum pot size of 45 litres; and
iii. 1 x 100 litre pot size feature tree planted to each side of the driveway within
the site and near the front boundary.
b. Retention of the existing street tree located near the south east corner of the site
as shown on the approved plans.
c. Provide an arborist report with construction methods to retaining the street tree in
good health during constructed.
d. Provide 1 x 45 litre pot size street tree located to the northern side of the driveway
crossover.
e. Provide a planting and plant schedule including species and pot size.
19. All landscape works must be established and maintained in accordance with the
approved design for the life of the development, and in a manner that ensures healthy,
sustained and vigorous plant growth. All plant material must be allowed to grow to full
form and be refurbished when its life expectancy is reached.
Noise
20. Written certification is required from a suitably qualified person confirming that sound
Page 25 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.