Skip to the record
The definitive source for everything Noosa Council.

Original source · versioned page text

2021-10-21 Ordinary Meeting Agenda

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

ORDINARY MEETING AGENDA                                                           21 OCTOBER 2021


          pressure levels from all mechanical plant and equipment comply with the following:
          a.    Air-conditioning and Refrigeration
                          7am to 10pm: Maximum level allowable = background + 5dB(A)
                          10pm to 7am: Maximum level allowable = background + 3dB(A)
          b.    Pumps
                          7am to 7pm: Maximum level allowable = background + 5dB(A)
                          7pm to 10pm: Maximum level allowable = background + 3dB(A)
                          10pm to 7am: No audible noise.
    21.   The certification must be submitted to Council, which certifies that operational noise from
          any fixed plant and equipment complies and with the requirements of this Decision
          Notice.
    HYDROLOGY
    Stormwater Drainage
    22.   The site must be provided with a stormwater drainage system connecting to a lawful
          point of discharge. The works must be undertaken in accordance with an Operational
          Works approval and must include in particular:
          a.    a Site Based Stormwater Management Plan which addresses the following:
                i.         existing overland flows and proposed overland flows;
                ii.        maintenance of overland flows within the subject site; and
                iii.       the drainage system for all roofed areas, hardstand, grassed areas and pool
                           surrounds.
    Erosion and Sediment Control
    23.   In conjunction with the application for Operational Works approval, provide an erosion
          and sediment control plan, prepared in accordance with Best Practice Erosion and
          Sediment Control (IECA, 2008) and which achieves the construction phase stormwater
          design objectives of the State Planning Policy 2017.
    WASTE DISPOSAL
    24.   The developer must provide waste storage and disposal facilities in accordance with
          Planning Scheme Policy 9 - Waste Management. The facilities must include an
          impervious area, within the site, correctly sized for all refuse and recycling containers
          and suitably screened from public places and neighbouring properties. A bin wash area
          is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
          trap. The drain outlet must be designed to prevent storm water entry to the sewerage
          system.
    25.   Refuse containers must be provided in accordance with the requirements of the
          Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
          Regulation 2000, for the storage and collection of refuse.
    ENGINEERING
    External Works
    26.   Margit Crescent must be upgraded for the length of its frontage to the subject site. The
          works, which must be undertaken in accordance with an Operational Works approval,
          are:
          a.    construction of a pedestrian footpath in accordance with the conditions of this
                Decision Notice


                                                                                        Page 26 of 29
Log in to download the original file

2021-10-21 Ordinary Meeting Agenda(PDF, 814KB).pdf · 833 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.