pressure levels from all mechanical plant and equipment comply with the following:
a. Air-conditioning and Refrigeration
7am to 10pm: Maximum level allowable = background + 5dB(A)
10pm to 7am: Maximum level allowable = background + 3dB(A)
b. Pumps
7am to 7pm: Maximum level allowable = background + 5dB(A)
7pm to 10pm: Maximum level allowable = background + 3dB(A)
10pm to 7am: No audible noise.
21. The certification must be submitted to Council, which certifies that operational noise from
any fixed plant and equipment complies and with the requirements of this Decision
Notice.
HYDROLOGY
Stormwater Drainage
22. The site must be provided with a stormwater drainage system connecting to a lawful
point of discharge. The works must be undertaken in accordance with an Operational
Works approval and must include in particular:
a. a Site Based Stormwater Management Plan which addresses the following:
i. existing overland flows and proposed overland flows;
ii. maintenance of overland flows within the subject site; and
iii. the drainage system for all roofed areas, hardstand, grassed areas and pool
surrounds.
Erosion and Sediment Control
23. In conjunction with the application for Operational Works approval, provide an erosion
and sediment control plan, prepared in accordance with Best Practice Erosion and
Sediment Control (IECA, 2008) and which achieves the construction phase stormwater
design objectives of the State Planning Policy 2017.
WASTE DISPOSAL
24. The developer must provide waste storage and disposal facilities in accordance with
Planning Scheme Policy 9 - Waste Management. The facilities must include an
impervious area, within the site, correctly sized for all refuse and recycling containers
and suitably screened from public places and neighbouring properties. A bin wash area
is required with a cold-water tap, hose and drain outlet connected to sewer, via a bucket
trap. The drain outlet must be designed to prevent storm water entry to the sewerage
system.
25. Refuse containers must be provided in accordance with the requirements of the
Environmental Protection (Interim Waste) Regulation 1996 and (Waste Management)
Regulation 2000, for the storage and collection of refuse.
ENGINEERING
External Works
26. Margit Crescent must be upgraded for the length of its frontage to the subject site. The
works, which must be undertaken in accordance with an Operational Works approval,
are:
a. construction of a pedestrian footpath in accordance with the conditions of this
Decision Notice
Page 26 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.