ORDINARY MEETING AGENDA 21 OCTOBER 2021
b. removal of all existing property access (driveway/crossovers) and reinstatement of
the kerb, footpath and verge area to match the balance of the site frontage,
including the provision of topsoil and turf where the existing verge is grassed.
Site Access and Driveways
27. A sealed access driveway must be provided from Margit Crescent to all parking and
manoeuvring areas of the development. The works must be undertaken in accordance
with an Operational Works approval and must include in particular:
a. a driveway crossover in accordance with Council standard drawings RS-051 and
addendums
Car Parking
28. Car parking must be provided generally in accordance with the approved plans. The
works must be undertaken in accordance with an Operational Works approval and must
include in particular:
a. dimensions, crossfalls and gradients in accordance with Australian Standard
AS2890: Parking Facilities
29. Pedestrian facilities must be provided for the development. The works must be
undertaken in accordance with an Operational Works approval and must include in
particular:
a. a 2 metre wide concrete footpath within the road verge for the entire length of the
site’s frontage to Margit Crescent.
This condition is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Easements
30. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
31. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard easement
terms. Draft easement documentation must be submitted to Council for endorsement.
32. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
33. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
Damage to Services and Assets
34. Any damage caused to existing services and assets as a result of the development works
must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and assets
must first be referred to the relevant service authority for approval
Page 27 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.