Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Referenced Document MCU13/0171

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

What are the impacts?                      SEE FACT SHEET 2



Soil, sediment and litter from building sites can be major
sources of stormwater pollution, and can cause:
•    negative impacts on recreational fishing and
     the seafood industry
•    sediment build-up within waterways which
     can lead to weed growth
•    loss of valuable topsoil
•    significant public safety problems when washed
                                                                                                                                ✕
     onto roads and intersections                                Mud and dirt on road after rain due to poor
                                                                 on-site erosion and sediment control
•    blocked drains and water sensitive urban design
     features leading to flooding and increased
     maintenance costs to the community
•    significant harm to the environment of freshwater
     and marine systems through the loss of valuable
     seagrass habitat for marine creatures
•    public health issues from increased algal blooms
•    reduced recreational opportunities due to increased
     turbidity
                                                                                                                                ✕
                                                                 Sediment moving out of Moreton Bay into the ocean
                                                                 through Jumpinpin



Erosion and sediment control on residential building sites                                                   SEE FACT SHEET 2



Principles of effective stormwater pollution control include:
•    sensible site planning
•    diversion of up-slope water (where appropriate)
•    stabilised site entry/exit point
•    minimisation of site disturbance and duration of
     disturbance
•    installation of sediment controls along the lower
     edge of the site
•    appropriate location and protection of stockpiles
•    early connection of roofwater downpipes
•    trap on-site run-off from tool, paint and concrete
     washing and brick, tile and concrete cutting
•    continual monitoring and maintenance of all
     control measures
•    compaction of backfilled trenches
•    revegetation and stabilisation of the site
•    development and implementation of Erosion
     and Sediment Control Management Plans                                                                                      ✓
     when appropriate.                                          Control measures in place on a residential building site




                                                                                                                                2

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT MCU13_0171.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.