Skip to the record
Noosa’s premier civic archive.

Council archive · source document

Referenced Document MCU13/0171

of 31

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Controlling stormwater pollution on your building site




    SITE PLANNING
When planning the site layout, building location and earthworks, it is possible to minimise the number
of control devices needed for the sediment control zone, and their interference with the building process,
with a little forward thinking. Suggestions are to:
•     minimise the reshaping of the land
•     direct stormwater to flow around the building area and any unstable batters
•     allow room for a sediment barrier, eg. sediment fence, to be located along the lower side of the disturbance
•     design the home to suit the property type, eg. construct pole homes on steep properties
•     avoid the permanent use of long, steep and unstable driveways
•     avoid the use of exposed aggregate concrete surfaces in areas where the wash-off cannot be contained.



                                                                                          Sediment Control Zone
                                                                                          The sediment control zone is any
                                                                                          area of land disturbance which has
                                                                                          potential for the erosion of sediments.
                                                                                          This area should be protected by a
                                                                                          downslope sediment control
                                                                                          measure or device.
                                 ✓                                                ✕
Good site planning                         Poor site planning – stockpile over
                                           sediment fence, materials and toilet
                                           stored outside building site




Environmental law                    SEE FACT SHEET 2



The Environmental Protection Act 1994, Environmental Protection (Water) Policy 1997 and the Integrated Planning
Act 1997 are important pieces of legislation that control the way in which soil erosion and sediment are required to
be dealt with on building and development sites.

    PENALTIES
Breaches of the Environmental Protection (Water) Policy
1997 may result in:
•     on-the-spot fines under the Environmental Protection
      (Water) Policy 1997 (ranging from $300 to $600)
•     prosecutions under the Integrated Planning Act
      1997 or the Environmental Protection Act 1994
      (fines of thousands of dollars or prison sentences
      for serious offences)
•     the prosecution of individuals and/or companies.               Council officer explaining the Environmental Protection
                                                                     (Water) Policy 1997




3

Used in these records

About this file

File size
4.4 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

REFERENCED DOCUMENT MCU13_0171.pdf · 4.4 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.